Custom Search
 
  
 


Concurrent Technologies Corporation
Remediation Survey
Air Sparging with Soil Vapor Extraction
Page 8
C.
Lessons Learned
1.
Lessons Learned about the Operation of the Equipment:
2.
Why was the Technology Successful?
In 4 months, reduced total VOCs from 41 ppm to 0.897 ppm
(after 125 days, contaminant level dropped 98%)
3.
Why was the Technology Unsuccessful?
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
2.
Cost:
B.
Construction of System
1.
Contract Type:
2.
Cost:
C.
Operation of System
1.
Contract Type:
2.
Cost:








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business