Custom Search
 
  
 


Concurrent Technologies Corporation
Remediation Survey
Air Sparging with Soil Vapor Extraction
Page 4
5.
Test Results
a.
Optimum Sparge Pressure:
b.
Optimum Vacuum:
c.
Radius of Influence:
d.
Contamination Removal Rate:
B.
Bench Scale Test
1.
Goals:
2.
Other:
IV.
TECHNOLOGY DESIGN - AIR SPARGING WITH SVE
Typical System Components:
Air Sparge Wells (Section A)
Air Sparge Pump System (Section B)
Vacuum Extraction Wells (Section C)
Vacuum Extraction System (Section D)
Offgas System (Section E)
Other:
A.
Air Sparge Wells
1.
Design Goals:
Well in zone of highest contamination.
2.
Design Parameters
a.
Pipe Type:
Steel
b.
Pipe Diameter:  2 inch
c.
Depth:
57-59 ft.
48-50 ft.
40-42 ft.
d.
Screen Interval:  2 ft.
e.
Screen Type:
Wire wrapped
f.
Number and Spacing:
3, 3 ft. apart
g.
Other:








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business