Concurrent Technologies Corporation
Remediation Survey
Air Sparging with Soil Vapor Extraction
Page 8
1.
Lessons Learned about the Operation of the Equipment:
Information based on pilot scale tests.
2.
Why was the Technology Successful?
3.
Why was the Technology Unsuccessful?
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
USGS
2.
Cost:
B.
Construction of System
1.
Contract Type:
USGS
2.
Cost:
$35-40K (equipment)
C.
Operation of System
1.
Contract Type:
USGS
2.
Cost:
$10K annual