Remediation Survey
Air Sparging with Soil Vapor Extraction
Page 6
3.
Design Tools:
Designed as a result of the pilot study.
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
D.
Vacuum System
1.
Design Goals:
2.
Design Parameters
a.
Operating Vacuum:
6-8 psi
b.
Operating Depths/Vacuums:
c.
Operating Mode (e.g., continuous, modulating, stepwise):
pulsed
d.
Other:  2-6 cfm extraction on flow rate (6 hrs on/6 hrs off)
3.
Design Tools:
Designed as a result of the pilot study.
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
E.
Offgas System
1.
Design Goals
a.
Contaminant Discharge Limit:
b.
Type:
2.
Design Parameters
a.
Flow Through Rate:
b.
Residence Time:
c.
Other:
3.
Regulatory Provisions