Concurrent Technologies Corporation
Remediation Survey
Air Sparging with Soil Vapor Extraction
Page 5
3.
Design Tools:
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
B.
Air Sparge Pump System
1.
Design Goals:
2.
Design Parameters
a.
Air Flow Rate: 200 CFM (10 H.P. blower)
b.
Operating Pressure:
c.
Operating Temperature:
d.
Steam Inclusion: N/A
e.
Other:
3.
Design Tools:
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
C.
Vacuum Extraction Wells
1.
Design Goals:
2.
Design Parameters
a.
Pipe Type:
b.
Pipe Diameter:
c.
Depth:
d.
Screen Interval:
e.
Screen Type:
f.
Number and Spacing:
5 wells
g.
Other:
3.
Design Tools: