Custom Search
 
  
 


Concurrent Technologies Corporation
Remediation Survey
Ground Water Pump and Treat with an Air Stripper
Page 5
3.
Design Tools:
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
Equalization Tank - 10-12 shut down/day
B1.
Equalization Tank - 10-12 shut downs/day
B2.
Filters
C.
Air Stripper
1.
Design Goals:
2.
Design Parameters
a.
Stripper Height:
b.
Stripper Diameter:
c.
Blower Rate:
d.
Packing Material:
e.
Pretreatment Requirements:
f.
Removal Efficiency:
g.
Other:
3.
Design Tools:
4.
Remediation Hardware:
5.
Capital Cost:
6.
Operating and Maintenance Cost:
D.
Carbon Treatment
1.
Design Goals
a.
Contaminant Types: TCE
b.
Contaminant Discharge Limits:
20 avg-40 max. to Ohio River
2.
Design Parameters
a.
GAC Type:
regenerated activated, 18-40 mesh








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business