Concurrent Technologies Corporation
Remediation Survey
Ground Water Pump and Treat with an Air Stripper
Page 8
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
Navy RAC Contractor - Foster Wheeler/Lump Sum
2.
Cost:
Approx. $20,000
B.
Construction of System
1.
Contract Type:
Navy RAC Contractor - Foster Wheeler/Lump Sum
2.
Cost:
Engineer's Estimate: See IV C.5
C.
Operation of System
1.
Contract Type:
Navy RAC Contractor - Foster Wheeler/Lump Sum
2.
Cost:
Engineer's Estimate: See IV C.6