Tweet |
Custom Search
|
|
|
||
Concurrent Technologies Corporation
Remediation Survey
Ground Water Pump and Treat with an Air Stripper
Page 7
2.
Why was the Technology Successful?
The UV/Peroxide system eliminated need for GAC polishing and treatment and reduced operation
and maintenance costs.
Successful in containing contaminated groundwater.
3.
Why was the Technology Unsuccessful?
Frequent chemical treatment.
Growth of bacterial slime.
Inadequate initial design of UV/Ozone/Peroxide treatment system
Significant downtime of UV/Peroxide system for cleaning filters, etc.
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
2.
Cost:
B.
Construction of System
1.
Contract Type:
2.
Cost:
$1,383,400 (capital cost - equipment, site preparation,
construction/engineering, start-up)
C.
Operation of System
1.
Contract Type:
2.
Cost:
$355,200 (inclding maintenence, project management, laboratory
analysis, supplies)
|
||