C.
Lessons Learned
1.
Lessons Learned about the Operation of the Equipment:
2.
Why was the Technology Successful?
3.
Why was the Technology Unsuccessful?
VI.
CONTRACT TYPE AND COSTS
A.
Design of System
1.
Contract Type:
2.
Cost:
See (B)
B.
Construction of System
1.
Contract Type:
2.
Cost:
$4,103,000 (design plus construction)
C.
Operation of System
1.
Contract Type:
2.
Cost: $149,200