Fig. 1. Compacted fill was placed on a two feet thick layer of crushed stone. In the area where
Foundation
concrete apron existed, it was left in place to substitute for crushed stone base.
soils are 4 feet of recent medium dense sand fill, which is under1ain by 55 to 60 feet (17 to 18 m)
thick, highly compressible clay.