Custom Search
 
  
 


DIRECTIONS FOR USE
1) See general information.
2) Mix reactor (R) into Base Alloy (A) in ratios:
By Volume -1 part A to 1 part R
By Weight -2 1/2 parts A to 1 part R
3) Working time is approximately 25 minutes at room temperature.
4) Deposits reach handling strength in 4 to 8 hours.
5) 100% strength is attained in 16 to 24 hours.
NOTE: SURFACES TO BE BONDED MUST BE ABSOLUTELY CLEAN AND FREE
OF OIL FILM OR MIST. USE CAUTION IN SELECTING CLEANING
SOLVENTS. COMPRESSED AIR USED FOR DRYING MAY CONTAIN OIL
OR MOISTURE.
GENERAL INFORMATION
For maximum bonding, prepare areas to be repaired by grit blasting, machining or abrading.
Clean with M-5 1 Cleaner Conditioner. Be sure areas being bonded are dry and free from
moisture. Bonding and hardening are enhanced when metal surfaces are above 75 oF. In cold
environments, heat parts with a flame, heat lamp or forced hot air. Be sure flame sources do not
leave carbon or other deposits.
3-3








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business