Tweet |
Custom Search
|
|
|
||
PROPERTIES
Coverage per one (1) unit container --------19 cubic inches
Strength begins to diminish when exposed to
s e r v i c e temperature exceeding ----------250F
C o l o r of hardened deposits --------------Dark Gray
Consistency of mixed compound ----------Putty
DIRECTIONS FOR USE:
1) See general information.
2) Mix reactor (R) into Base Alloy (A) in ratios:
By Volume -2 parts A to 1 part R
By Weight -4 parts A to 1 part R
3) Working time is approximately 30 minutes at room temperature.
4) Deposits reach handling strength in 4 to 8 hours.
5) 100% strength is attained in 16 to 24 hours.
NOTE: SURFACES TO BE BONDED MUST BE ABSOLUTELY CLEAN AND FREE
OF OIL FILM OR MIST. USE CAUTION IN SELECTING CLEANING
SOLVENTS. COMPRESSED AIR USED FOR DRYING MAY CONTAIN OIL
OR MOISTURE.
3-11
|
||