Tweet |
Custom Search
|
|
|
||
PROPERTIES
Coverage per one (1) unit container --------14 cubic inches
Strength begins to diminish when exposed to
temperatures over ------------------225F
C o l o r of hardened deposits --------------Dark Gray
Consistency of mixed compound ----------Putty
DIRECTIONS FOR USE.
1) See general information.
2) Mix reactor (R) into Base Alloy (A) in ratios:
By Volume -1 part A to 1 part R
By Weight -2 parts A to 1 part R
3) Working time after mixing is approximately 2 to 5 minutes at 700F.
4) Deposits reach handling strength in 10 to 20 minutes.
5) 100% strength is attained in 8 to 12 hours.
NOTE: SURFACES TO BE BONDED MUST BE ABSOLUTELY CLEAN AND FREE
OF OIL FILM OR MIST. USE CAUTION IN SELECTING CLEANING
SOLVENTS. COMPRESSED AIR USED FOR DRYING MAY CONTAIN OIL
OR MOISTURE.
3-15
|
||