Custom Search
 
  
 


PT-603
PT-607
SCRAPE OR WIRE BRUSH 25% OF FIAT, SLIGHTLY CURVED
SCRAPE OR WIRE BRUSH 25% OF IRREGULAR, ANGULAR OR
OR UNOBSTRUCTED SURFACE, SAND 50% AND WIPE 100%
DIFFICULT TO REACH SURFACE, SAND 50% AND WIPE 100%
NO WORK UNIT DESCRIPTION
NO WORK UNIT DESCRIPTION
====================================================
====================================================
1 CLEAN 12.5% OF SURFACE WITH WIRE BRUSH
1 CLEAR 12.5% OF SURFACE WITH WIRE BRUSH
2 CLEAN 12.5% OF UNOBSTRUCTED SURFACE WITH SCRAPER
2 CLEAN 12.5% OF OBSTRUCTED SURFACE WITH SCRAPER
3 BEND AND ARISE WHILE SCRAPING AND WIRE BRUSHING
3 BEND AND ARISE WHILE SCRAPING AND WIRE BRUSHING
4 PREPARE TO SAND 50% OF SURFACE
SURFACE
5 SAND AND INSPECT 50% OF GOOD SURFACE
4 PREPARE TO HAND SAND 50% OF AN OBSTRUCTED SURFACE
6 BEND AND ARISE WHILE SANDING SURFACE
5 SAND AND INSPECT SD% OF AN OBSTRUCTED SURFACE
7 WIPE 10% OF SURFACE WITH CLOTH
6 WIPE 100% OF AN OBSTRUCTED SURFACE WITH CLOTH
PT-603 =
.00271 HRS PER SQ FT
PT-607 =
.00569 HRS PER SQ FT
PT-604
PT-608
SAND 100% OF FLAT, SLIGHTLY CURVED OR UNOBSTRUCTED
SAND 100% OF IRREGULAR, ANGULAR OR DIFFICULT TO
SURFACE AND WIPE 100% OF SURFACE WITH CLOTH
REACH SURFACE AND WIPE 100% OF SURFACE WITH CLOTH
NO WORK UNIT DESCRIPTION
NO WORK UNIT DESCRIPTION
====================================================
====================================================
1 PREPARE TO SAND SURFACE
1 PREPARE TO SAND 100% OF AR OBSTRUCTED SURFACE
2 SAND AND INSPECT 100% OF UNOBSTRUCTED SURFACE
2 SAND AND INSPECT 100% OF AN OBSTRUCTED SURFACE
3 BEND AND ARISE WHILE SANDING SURFACE
3 BEND AND ARISE WHILE SANDING 100% OF SURFACE
4 WIPE 100% OF UNOBSTRUCTED SURFACE WITH CLOTH
4 WIPE 100% OF OBSTRUCTED SURFACE WITH CLOTH
PT-604 =
.00204 HRS PER SQ FT
PT-608 =
.00546 HRS PER SQ FT
PT-605
PT-612
WIPE IRREGULAR, ANGULAR OR DIFFICULT TO REACH
SAND AND WIPE UP TO 1.5" DIAMETER PIPE OR COLUMN
SURFACE WITH CLOTH
NO WORK UNIT DESCRIPTION
====================================================
NO WORK UNIT DESCRIPTION
====================================================
1 PREPARE TO SAND SURFACE OF PIPE OR COLUMN
1  WIPE IRREGULAR SURFACE WITH CLOTH (FIRST SQ FT)
2 SAND AND INSPECT 100% OF PIPE OR COLUMN
2  WIPE IRREGULAR SURFACE WITH CLOTH (ADD'L SQ FT)
3 WIPE 100% OF PIPE OR COLUMN
3  BEND AND ARISE WHILE WIPING IRREGULAR SURFACE
4 WALK TO NEXT AREA
PT-612 =
.00138 HRS PER LIN FT
PT-605 =
.00181 HRS PER SQ FT
PT-613
SAND AND WIPE 2" TO 4" DIAMETER PIPE OR COLUMN
PT-606
NO WORK UNIT DESCRIPTION
SAND 25% OF IRREGULAR, ANGULAR OR DIFFICULT TO
====================================================
REACH SURFACE AND WIPE 100% OF SURFACE WITH CLOTH
1 PREPARE TO SAND SURFACE OF PIPE OR COLUMN
2 SAND AND INSPECT 100% OF PIPE OR COLUMN
NO WORK UNIT DESCRIPTION
=================================================- - - -
- - ===
3 WIPE 100% OF PIPE OR COLUMN
1 PREPARE TO SAND 25% OF SURFACE
2 SAND AND INSPECT 25% OF BAD SURFACE
PT-613 =
.00414 HRS PER LIN FT
3 BEND AND ARISE WHILE SANDING SURFACE
4 WIPE 100% OF OBSTRUCTED SURFACE WITH CLOTH
PT-606 =
.00273 HRS PER SQ FT
30








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business