PT-653
PT-648
MASK WALL, TRIM, DOOR, WINDOW PERIMETER, ETC
SANDBLAST METAL BEAMS, TRUSSES OR OTHER STRUCTURAL
MEMBERS, NEAR WHITE METAL BLAST
NO WORK UNIT DESCRIPTION
====================================================
NO WORK UNIT DESCRIPTION
====================================================
1 PICK UP SUPPLIES AND/OR EQUIPMENT AND LAY ASIDE
2 WALK TO MASK WALL, TRIM OR OBJECT
1 LOAD 300 POUNDS OF SAND INTO SANDBLASTING POT
3 APPLY TAPE TO WALL
2 PREPARE TO SANDBLAST SURFACE
4 REMOVE TAPE FROM WALL
3 POSITION GUN PRIOR TO BLASTING
4 SANDBLAST METAL BEAMS, TRUSSES OR OTHER STRUCTURAL 5 DISPOSE OF WASTE TO TRASH CAN OUTSIDE BUILDING
MEMBERS, NEAR WHITE METAL BLAST
PT-653 =
5 INSPECT SURFACE AFTER BLASTING
.00393 HRS PER LIN FT
6 REMOVE SPENT SAND FROM SANDBLASTING AREA
PT-648 =
.05678 HRS PER SQ FT
PT-673
V-OUT OLD CRACK AND APPLY PLASTER OR SPACKLE
PT-649
NO WORK UNIT DESCRIPTION
====================================================
SANDBLAST METAL BEAMS, TRUSSES OR OTHER STRUCTURAL
1 SET UP AND HANDLING TIME
MEMBERS, WHITE METAL BLAST
2 V-OUT CRACK AND APPLY PLASTER OR SPACKLE
NO WORK UNIT DESCRIPTION
====================================================
.03370 HRS PER LIN FT
PT-673 =
1 LOAD 300 POUNDS OF SAND INTO SANDBLASTING POT
2 PREPARE TO SANDBLAST SURFACE
3 POSITION GUN PRIOR TO BLASTING
4 SANDBLAST METAL BEAMS, TRUSSES OR OTHER STRUCTURAL PT-677
MEMBERS, WHITE METAL BLAST
APPLY TAPE & 3 COATS OF COMPOUND TO PLASTER BOARD
5 INSPECT SURFACE AFTER BLASTING
SEAM
6 REMOVE SPENT SAND FROM SANDBLASTING AREA
PT-649 =
.09805 HRS PER SQ FT
NO WORK UNIT DESCRIPTION
====================================================
1 SET UP AND HANDLING TIME
2 APPLY THREE COATS OF COMPOUND AND TAPE
PT-651
PT-677 =
.02090 HRS PER SQ FT
MASK SMALL OBJECT WITH TAPE AND REMOVE
NO WORK UNIT DESCRIPTION
====================================================
PT-678
1 PICK UP SUPPLIES AND/OR EQUIPMENT AND LAY ASIDE
APPLY TAPE & COMPOUND TO PLASTER BOARD SEAM,
2 WALK 20 PACES TO OBJECT
INCLUDING SAND & WIPE AFTER 3RD COAT OF COMPOUND
3 MASK SMALL OBJECT
4 REMOVE TAPE FROM SMALL OBJECT
NO WORK UNIT DESCRIPTION
5 DISPOSE OF WASTE TO TRASH CAN OUTSIDE BUILDING
====================================================
1 SET UP AND HANDLING TIME
PT-651 =
.01381 HRS PER OBJECT
2 APPLY THREE COATS OF COMPOUND AN0 TAPE
3 SAND PLASTER BOARD SEAM
4 WIPE PLASTER BOARD SEAM
PT-652
.02137 HRS PER SQ FT
PT-678 =
MASK MEDIUM SIZED OBJECT WITH TAPE AND REMOVE
NO WORK UNIT DESCRIPTION
====================================================
1 PICK UP SUPPLIES AND/OR EQUIPMENT AND LAY ASIDE
2 WALK 20 PACES TO OBJECT
3 MASK MEDIUM OBJECT
4 REMOVE TAPE FROM MEDIUM OBJECT
5 DISPOSE OF WASTE TO TRASH CAN OUTSIDE BUILDING
PT-652 =
.03621 HRS PER OBJECT
34