Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


MIL-HDBK-1013/12
APPENDIX B
SECURITY GLAZING PLANNING AND ANALYSIS WORKSHEETS
B.1
Introduction.  This appendix contains worksheets to be
used with the planning and design procedures described in the
handbook.  Local reproduction of these worksheets is authorized.
B.2
Worksheet Summary.  The following list summarizes the
worksheets contained in this appendix.
a) Glazing System Design Criteria Summary (DCS)
b) Asset Value/Aggressor Likelihood (AVAL)
c) Glazing System Tactic and Threat Severity Level
(TTSL)
d) Collateral Damage Assessment (CDA)
e) Cross-Section Evaluation (CSE)
f) Frame Evaluation (FE)
g) Anchorage Evaluation (AE)
h) Wall Evaluation (WE)
i) Cross-Section Selection (CSS)
j) Frame Selection (FS)
k) Anchorage Selection (AS)
l) Wall Selection (WS)
m) Cross-Section Cost Factor (CSFC)
n) Frame Cost Factor (FCF)
o) Installation Cost
p) Initial Cost
q) Safevue Data Entry (SDE)
r) Safevue Analysis (SA)
98








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business