-  Evaluation and Selection Analysis of Security Glazing for Protection Against Ballistic,Bomb, and Forced Tactics
 -  Abstract
 -  Abstract -Cont.
 -  Foreword
 -  Table of Contents
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 - Section 1: Introduction
 - Ballistic Resistant Glazing
 - Security Glazing Planning and Analysis Worksheets
 - Required Information
 - Organization of Procedures
 - Related Instructions
 - Figure 1. Planning Procedures Organization
 - Figure 2. Analysis Procedures Organization
 - Figure 3. Safevue Procedures Organization
 - OPNAVINST 5510.1H.
 - Section 2: Glazing System Overview
 - Monolithic Cross-Sections
 - Thermally Tempered Glass
 - Chemically Treated Glass
 - Wire-Reinforced Glass
 - Acrylic
 - Laminated Cross-Sections
 - Fragment Retention Film
 - Thermally Tempered Glass (TTG)
 - Laminated and Fused Polycarbonate
 - Glass-Clad Ionomer
 - Insulated/Air Gap Cross-Sections
 - Glazing Tape, Sealant  and Setting Blocks
 - Ballistic Resistance
 - Anchor Bolt Types
 - Embedded Anchor
 - Unreinforced Brick
 - Table 1. Wall Construction
 - Section 3: Aggressor Threats and Tactics
 - Categories Not Addressed
 - Tools, Weapons, and Explosives
 - Section 4: System Analysis
 - System Evaluation Procedure
 - Figure 6. Process Chart and Description:  System Selection Procedure
 - Figure 7. Process Chart and Description:  System Evaluation Procedure
 - Selection Attack Analyses Procedure
 - Figure 8 .Process Chart and Description:  Selection Attack Analyses Procedure
 - Figure 9. Process Chart and Description:  Evaluation Attack Analyses Procedure
 - Required Information
 - Figure 10. Process Chart: Selection Reconciliation Procedure
 - Evaluation Reconciliation Procedure
 - Requirements Revision Procedure
 - Figure 12. Process Chart: Evaluation Reconciliation Procedure
 - Figure 13. Procedure Description: Evaluation Reconciliation Procedure
 - Figure 14. Process Chart: Requirements Revision Procedure
 - Figure 15. Procedure Description: Requirements Revision Procedure
 - Section 5: Ballistic Resistant Glazing
 - Figure 16. Process Chart: Ballistic Resistant Glazing Evaluation Procedure
 - Table 5. Ballistic Tactic Threat Severity Level Standards
 - Required Information
 - Figure 18. Process Chart: Cross-Section Ballistic Resistant Thicknesses Procedure
 - Figure 19. Description: Cross-Section Ballistic Resistant Thicknesses Procedure
 - Required Information
 - Ballistic Resistant Glazing Selection Procedure
 - Figure 20. Process Chart: Ballistic Resistant Glazing Selection Procedure
 - Required Information
 - Section 6: Blast Resistant Glazing
 - Frame Loads
 - Blast Resistant Glazing Evaluation Procedure
 - Figure 22. Process Chart: Blast Resistant Glazing Evaluation Procedure
 - Required Information
 - Blast Resistant Glazing Selection Procedure
 - Figure 24. Process Chart: Blast Resistant Glazing Selection Procedure
 - Figure 25. Description: Blast Resistant Glazing Selection Procedure
 - Section 7: Forced Entry Resistant Glazing
 - Required Information
 - Figure 26. Process Chart: Forced Entry Resistant Glazing Selection Procedure
 - Figure 27. Description: Forced Entry Resistant Glazing Selection Procedure
 - Table 17. Lag Bolt Maximum Spacing for Low Threat Severity Level
 - Table 22. Minimum Frame Specification for Medium Threat Severity Level
 - Forced Entry Resistant Glazing Evaluation Procedure
 - Required Information
 - Figure 28. Process Chart: Forced Entry Resistant Glazing Evaluation Procedure
 - Figure 29. Description: Forced Entry Resistant Glazing Evaluation Procedure
 - Section 8: Environmental Analysis
 - Polycarbonate Environmental Analysis Procedure
 - Laminated Glass Environmental Analysis Procedure
 - Required Information
 - Section 9: Cost Analysis
 - Figure 34. Process Chart and Description:  Cost Estimate Procedure
 - Cross-Section Material Cost Estimate Procedure
 - Figure 36. Process Chart and Description: Cross-Section Material Cost Estimate Procedure
 - Table 29. Glass Cost Factors and Weight per Unit Area (English Units)
 - Cross-Section Fabrication Cost Estimate Procedure
 - Figure 37. Process Chart: Cross-Section Fabrication Cost Estimate Procedure
 - Required Information
 - Figure 39. Process Chart and Description:  Frame Cost Estimate Procedure
 - Installation Cost Estimate Procedure
 - Initial Cost Estimate Procedure
 - Figure 40. Process Chart and Description:  Installation Cost Estimate Procedure
 - Figure 41. Process Chart and Description:  Initial Cost Estimate Procedure
 - Appendix A Process Charts
 - Simple Sequence Structure
 - Procedural Structure
 - Iteration Structure
 - Figure A-7. Do While Structure
 - Figure A-8. For Structure
 - Appendix B- Security Glazing Planning and Analysis Worksheets
 - Glazing System Design Criteria Summary Worksheet
 - Asset Value /Aggressor Likelihood Worksheet
 - Glazing System Tactic and Threat Severity Level Worksheet
 - Collateral Damage Assessment Worksheet
 - Cross-Section Evaluation Worksheet
 - Frame Evaluation Worksheet
 - Anchorage Evaluation Worksheet
 - Wall Evaluation Worksheet
 - Cross-Section Selection Worksheet
 - Frame Selection Worksheet
 - Anchorage Selection Worksheet
 - Wall Selection Worksheet
 - Cross-Section Cost Factor Worksheet
 - Frame Cost Factor Worksheet
 - Installation Cost Worksheet
 - Initial Cost Worksheet
 - Safevue Data Entry Worksheet
 - Safevue Analysis Worksheet
 - Appendix C Safevue Procedures
 - Figure C-1. Process Chart and Description:  Safevue Evaluation Analysis Procedure
 - Glazing Data Preparation for Evaluation Analysis
 - Figure C-2. Process Chart and Description:  Data Preparation for Evaluation Analysis Procedure
 - Required Information
 - Explosives Data Preparation Procedure
 - Required Information
 - Safevue Startup Procedure
 - Data Entry Procedure
 - Glazing Data Entry Procedure
 - Figure C-8. Process Chart: Glazing Data Entry Procedure
 - Explosives Data Entry Procedure
 - Figure C-10. Process Chart and Description:  Explosives Data Entry Procedure
 - Algorithm Data Entry Procedure
 - Safevue Selection Analysis Procedure
 - Data Preparation for Selection Analysis Procedure
 - Figure C-13. Process Chart: Safevue Selection Analysis Procedure
 - Figure C-14. Description: Safevue Selection Analysis Procedure
 - Glazing Data Preparation for Selection Analysis Procedure
 - Figure C-16. Process Chart: Glazing Data Preparation for Selection Analysis Procedure
 - Table C-1. Minimum Thickness Table Selection for Thermally Tempered Glass
 - Table C-2. Minimum Thickness Table Selection for Polycarbonate
 - Table C-5. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 220-lb TNT
 - Table C-8. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 230-kg TNT
 - Table C-9. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 1000-lb TNT
 - Table C-11. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 50-lb TNT
 - Table C-13. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident
 - Table C-15. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 500-lb TNT
 - Table C-17. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 1000-lb TNT
 - Table C-19. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 50-lb TNT
 - Table C-20. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 23-kg TNT
 - Table C-24. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 230-kg TNT
 - Table C-25. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 1000-lb TNT
 - Table C-27. Minimum Thickness of Thermally Tempered Glass (in.) to Survive Incident Overpressure from 50-lb TNT
 - Table C-32. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 230-kg TNT
 - Table C-34. Minimum Thickness of Thermally Tempered Glass (mm) to Survive Incident Overpressure from 460-kg TNT
 - Table C-35. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 50-lb (23-kg) TNT
 - Table C-36. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 220-lb (100-kg) TNT
 - Table C-37. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 500-lb (230-kg) TNT
 - Table C-38. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 1000-lb (460-kg) TNT
 - Table C-39. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 50-lb (23-kg) TNT
 - Table C-40. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 220-lb (100-kg) TNT
 - Table C-41. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 500-lb (230-kg) TNT
 - Table C-42. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 1000-lb (460-kg) TNT
 - Table C-43. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 50-lb (23-kg) TNT
 - Table C-45. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 500-lb (230-kg) TNT
 - Table C-48. Minimum Thickness of Polycarbonate (in.) to Survive Incident Overpressure from 220-lb (100-kg) TNT
 - Plate Data Preparation Procedure
 - Results Analysis Procedure
 - Figure C-19. Process Chart and Description:  Results Analysis Procedure
 - Modifying a Cross-Section to Avoid Failure
 - Modifying a Cross-Section to Avoid Overdesign
 - Appendix D. Risk Analysis
 - Planning Procedure
 - Information Sensitivity
 - Information Sensitivity -Cont.
 - Section D-2. Assets
 - Required Information
 - Figure D-3. Process Chart:  Assets Procedure
 - Primary Asset Value Assessment Procedure
 - Figure D-5. Process Chart and Description:  Asset Identification Procedure
 - Figure D-6. Process Chart: Primary Asset Value Assessment Procedure
 - Figure D-7. Description: Primary Asset Value Assessment Procedure
 - Criticality to the Military's Mission
 - Asset Replaceability
 - Relative Value for AA&E
 - Relative Value for Controlled Medical Substances
 - Relative Value for Other Assets
 - Relative Value for People as Assets
 - Secondary Asset Value Assessment Procedure
 - Required Information
 - Table D-13. Secondary Asset Value Rating
 - Section D-3. Design Basis Threat
 - Identification of Likely Aggressors Procedure
 - Identify Likely Aggressor
 - Figure D-11. Potential Aggressors Selection Table
 - Likelihood of Aggression Procedure
 - Figure D-12. Process Chart:  Likelihood of Aggression
 - Asset Profile
 - Table D-15. Asset Usefulness to Aggressor Factor Applicability Table
 - Usefulness for Assets with Direct Application to Aggressor's Goals
 - Usefulness for Assets with Publicity Value
 - Local Incidents in the Past
 - Nearby Incidents in the Past
 - Asset Accessibility
 - Table D-21. Potential for Future Incidents
 - Table D-22. Asset Accessibility Factor Applicability Table
 - Table D-24. Accessibility of Unit Level Storage of AA&E
 - Effectiveness of Law Enforcement
 - Deterrence
 - Likelihood Rating
 - Required Information
 - Applicability of Indicated Threat Severity Levels
 - Figure D-14. Process Chart: Applicable Tactics and Severity Levels Identification Procedure
 - Figure D-15. Description: Applicable Tactics and Severity Levels Identification Procedure
 - Figure D-16. Potential Tactic Selection Table
 - Tactics Consolidation Procedure
 - Figure D-18. Process Chart and Description:  Tactics Consolidation Procedure
 - Table D-30. Threat Parameters
 - Section D-4. Level of Protection
 - Figure D-19. Process Chart: Level of Protection Procedure
 - Collateral Damage Assessment Procedure
 - Required Information
 - Figure D-21. Process Chart: Collateral Damage Assessment Procedure
 - Figure D-22. Description: Collateral Damage Assessment Procedure
 - Table D-32. Asset Categories with Collateral Damage Potential
 - Figure D-23. Process Chart: Collateral Damage Threat Severity Level
 - Figure D-24. Description: Collateral Damage Threat Severity Level
 - Appendix F Examples
 - Facility Characteristics
 - Table E-1. Description of Primary Assets
 - Table E-2. Actions for Example Number 1
 - Figure E-1. DCS Worksheet for Example Number 1
 - Asset Value/Aggressor Likelihood Worksheet
 - Asset Value/Aggressor Likelihood Worksheet -Cont.
 - Asset Value/Aggressor Likelihood Worksheet -Cont.
 - Asset Value/Aggressor Likelihood Worksheet -Cont.
 - Asset Value/Aggressor Likelihood Worksheet -Cont.
 - Example Number 2:  Design Basis Threat Procedure
 - High-Ranking Military Personnel
 - Administration Staff
 - Back Up Generator
 - Table E-4. Actions for Example Number 2, Continued
 - Table E-4. Actions for Example Number 2, Continued 
 - Glazing System Tactic and Threat Severity Level Worksheet
 - Figure E-8. DCS Worksheet for Example Number 2
 - Figure E-9. TTSL Worksheet for Office Equipment
 - Figure E-9. TTSL Worksheet for Office Equipment
 - Figure E-11. TTSL Worksheet for Administration Staff
 - Figure E-12. TTSL Worksheet for Back Up Generator
 - Example Number 3:  Level of Protection
 - Figure E-13. DCS Worksheet for Example Number 3
 - Example Number 4:  System Analysis
 - Table E-6. Blast Design Properties and Results
 - Table E-7. Cost Data
 - Table E-8. Actions for Example Number 4
 - Figure E-14. CSS Worksheet Before Revising Requirements
 - Figure E-15. FS Worksheet Before Revising Requirements
 - Figure E-16. WS Worksheet Before Revising Requirements
 - Safevue Data Entry Worksheet
 - Table E-9. Actions for Example Number 4, Continued
 - Figure E-18. SA Worksheet for Laminated Glass
 - Table E-10. Actions for Example Number 4, Continued
 - Table E-11. Actions for Example Number 4, Continued
 - Table E-12. Actions for Example Number 4, Continued
 - Figure E-19. SA Worksheet for Laminated Polycarbonate
 - Figure E-20 SA Worksheet for Glass-Clad Polycarbonate
 - Figure E-21. SA Worksheet for Air-Gap with Polycarbonate
 - Table E-13. Actions for Example Number 4, Continued
 - Figure E-22.AS Worksheet Before Revising Requirements
 - Table E-14. Actions for Example Number 4, Continued
 - Figure E-23. CSS Worksheet After Revising Requirements
 - Figure E-24. FS Worksheet After Revising Requirements
 - Figure E-25. AS Worksheet After Revising Requirements
 - Figure E-26. WS Worksheet After Revising Requirements
 - Figure E-27. CSCF Worksheet for Glass-Clad Polycarbonate
 - Table E-15. Actions for Example Number 4, Continued
 - Figure E-28. FCF Worksheet
 - Table E-16. Actions for Example Number 4, Continued
 - Figure E-29. Installation Cost Worksheet
 - Figure E-30. Initial Cost Worksheet
 - Figure E-31. CSCF Worksheet for Laminated Polycarbonate
 - Figure E-32. CSCF Worksheet for Air-Gap with Polycarbonate
 - Appendix F- Cross Sections
 - Air-Gap
 - Figure F-2. 7/8-inch Air-Gap
 - Figure F-5. 1-1/4-inch Air-Gap
 - Figure F-7. 1-15/16-inch Air-Gap
 - Extruded Ionomer
 - Glass-Clad Polycarbonate
 - Figure F-12. 11/16-inch Glass-Clad Polycarbonate
 - Figure F-14. 15/16-inch Glass-Clad Polycarbonate
 - Figure F-16. 1-3/16-inch Glass-Clad Polycarbonate
 - Figure F-18. 1-3/16-inch Glass-Clad Polycarbonate
 - Figure F-20. 1-5/16-inch Glass-Clad Polycarbonate
 - Figure F-22. 1-3/8-inch Glass-Clad Polycarbonate
 - Figure F-24. 1-5/8-inch Glass-Clad Polycarbonate
 - Figure F-26. 2-1/16-inch Glass-Clad Polycarbonate
 - Laminated Glass
 - Figure F-29. 2-inch Laminated Glass
 - Laminated Polycarbonate
 - Figure F-31. 1-1/4-inch Laminated Polycarbonate
 - Bibliography
 - References
 - References -Cont.
 - References -Cont.
 - Glossary
 - Glossary -Cont.
 - Glossary -Cont.
 - Glossary -Cont.
 - Glossary -Cont.
 -  Index
 -  Index -Cont.
 -  Index -Cont. 
 -  Index -Cont. 
 -  Index -Cont. 
 -  Index -Cont. 
 -  Index -Cont. 
 -  Index -Cont. 
 -  Standardization Document Improvement Proposal
 
 Evaluation and Selection Analysis of Security Glazing for Protection Against 
Ballistic,Bomb, and Forced Tactics 
 
  | 
			
 
 
 
 
   
  |