Required Information.  The following information is
required for a Safevue selection analysis:
a) Worksheets (see Appendix B):
1)  Safevue Analysis (SA)
2)  Cross-Section Selection (CSS)
C.13
Data Preparation for Selection Analysis Procedure.
This procedure helps to prepare data worksheets for selecting a
glazing system subjected to blast loading.  It provides a set of
structures that step an analyst through glazing, explosives, and
algorithm data preparation.  A process chart and description of
the procedure are shown in Figure C-15.
C.13.1
Required Information.  The following information is
required for data preparation for an evaluation analysis:
a) Project identification
a) Asset identification.  This information is
determined using Figure D-3 and is recorded on the
Glazing System Design Criteria Summary worksheet.
b) Worksheets (see Appendix B):
1)  Safevue Data Entry (SDE)
2)  Safevue Analysis (SA)