Custom Search
|
|
|
||
MIL-HDBK-1013/12
Frame Cost Factor Worksheet
1. Project/Building Identification
2. Asset Identification
3. Date
Communications Equipment
21 Feb 96
Example Number 4
Description
Material
Thickness Type Cost Sub-frame
Size
Cost Factor Number of Frame Cost
(in.)
Factor Cost Factor (linear ft.) per Frame Frames
Factor
(f) = (c) x
(a)
(b)
(c)
(d)
(e)
(d) x (e)
(g)
(h) = (f) x (g)
Heavy Security steel
1/4"
2.3
1.0
10
23
2
46
Figure E-28
FCF Worksheet
274
|
||