MIL-HDBK-1013/12
Table E-15
Actions for Example Number 4, Continued
Action
Action
Procedure
Figure
Structure
Number
Number
Number
144
Calculate cross-section weight: 44.4
Cross-Section
Figure 36
<6>
pounds. See Figure E-27
Material Cost
145
Calculate cross-section material cost
Estimate
<7>
factor: 1128.
146
Do Cross-section Fabrication Cost
Cross-Section Cost
Figure 35
<2>
Estimate procedure
Estimate
147
Is cross-section smaller than 6 square
Cross-Section
Figure 37
<1>
feet? No.
Fabrication Cost
148
Enter normal size cost factor: 1.0.
Estimate
<3>
149
Is cross-section heavier than 300
<4>
pounds? No.
150
Enter normal weight cost factor. 1.0.
<6>
151
Is cross-section all glass. No.
<7>
152
Enter mixed material cost factor: 1.25.
<9>
153
Calculate cross-section cost factor:
Cross-Section Cost
Figure 35
<3>
1410.
Estimate
154
Do Frame Cost Estimate procedure.
Cost Estimate
Figure 34
<3>
155
Enter frame material: steel. See Figure
Frame Cost
Figure 39
<1>
E-28
156
Enter frame thickness: 1/4".
Estimate
<2>
157
Get frame type cost factor using Table
<3>
35: 2.3.
158
Does the frame require a sub-frame?
<4>
No.
159
Enter cost factor for no sub-frame: 1.0.
<6>
160
Enter frame size: 10 linear feet.
<7>
161
Calculate cost factor per frame: 23.
<8>
162
Enter number of frames: 2.
<9>
163
Calculate frame cost factor: 46.
<10>
164
Do Installation Cost Estimate procedure.
Cost Estimate
Figure 34
<4>
273