<1> Selection Attack Analyses. Conduct
ballistic, bomb, and forced entry analysis of
Start
the glazing cross-section, frame, anchorage
and wall using Figure 8. Proceed to <2>.
<2> Environmental Analysis. Conduct
environmental analysis using Figure 30.
<1> Selection
Proceed to <3>.
<3> Selection Reconciliation. Determine the
Attack
Analyses
minimum requirements for the glazing system
and components using Figure 10. Proceed to
<4>.
<2>
<4> Assess Status of Requirements. Review
Environmental
Cross-Section Selection, Frame Selection,
Analysis
and Anchorage Selection worksheets (see
Appendix B for all worksheets). Set aside
worksheets that have the "No" box checked
for the "Does Glazing Cross-Section Meet
<3> Selection
Design Requirements?" These are unmet
Reconciliation
requirements. Proceed to <5>.
<5> Are All Requirements Met? If all
requirements have been met, proceed to <6>.
<4> Assess
Otherwise, proceed to <7> to revise
Status of
requirements.
<6> Cost Estimate. Conduct a cost analysis of
Requirements
the selected glazing system components
using Figure 34. Return to Figure 5.
<7> For Each Unmet Requirement: Use the
<5> Are
Yes
Selection worksheets to identify unmet
All Requirements
requirements. Proceed to <8> for next unmet
Met?
requirement. Proceed to <1> when all unmet
requirements have been revised.
No
<8> Requirement Revision. Revise requirements
to locate acceptable glazing system
<7> For Each
<6> Cost
Done
components using Figure 14. Proceed to <7>
Unmet
Estimate
for next requirement.
Requirement:
Next
<8>
Requirement
Stop
Revision
Figure 6
Process Chart and Description:  System Selection Procedure