MIL-HDBK-1013/12
<1> Evaluation Attack Analyses.
Conduct ballistic, bomb and
forced entry analysis of the
Start
glazing cross-section, frame,
anchorage and wall using Figure
9. Proceed to <2>.
<2> Environmental Analysis.
<1> Evaluation
Conduct environmental analysis
Attack
using Figure 30. Proceed to <3>.
Analyses
<3> Evaluation Reconciliation.
Determine the minimum
requirements for the glazing
<2>
system and components using
Figure 12. Proceed to <4>.
Environmental
<4> Assess Status of
Analysis
Requirements. Review Cross-
Section Evaluation, Frame
Evaluation, and Anchorage
<3> Evaluation
Evaluation worksheets (see
Appendix B for all worksheets).
Reconciliation
Set aside worksheets that have
the "No" box checked for the
"Does Glazing Cross-Section
<4> Assess
Meet Design Requirements?"
Proceed to <5>.
Status of
<5> Are Any Requirements Unmet?
Requirements
Use the evaluation worksheets
with unmet requirements.
Proceed to <6> if any
requirements are unmet. Return
<5> Are
to Figure 5, if there are no unmet
No
Any Requirements
requirements.
Unmet?
<6> Glazing System Failed
Evaluation. The existing glazing
Yes
system failed to meet
requirements. Consider doing a
<6> Glazing
selection application to determine
appropriate replacement glazing
System Failed
systems. Return to Figure 5.
Evaluation
Stop
Figure 7
Process Chart and Description: System Evaluation Procedure
35