<1> Selection Application? If the
analysis is for new construction,
Start
either a new facility or planned
retrofit of an existing facility,
proceed to <2> to analyze a
selection application. Otherwise,
proceed to <3> to analyze an
<3> System
<1> Selection
No
evaluation application.
<2> System Selection. Conduct an
Evaluation
Application?
analysis to select a glazing system
using Figure 6. Stop the system
Yes
analysis procedure.
<3> System Evaluation. Conduct an
<2> System
analysis to evaluate a glazing
Selection
system using Figure 7. Stop the
system analysis procedure.
Stop
Figure 5
Process Chart and Description:  System Analysis Procedure
4.3
System Selection Procedure.  This procedure breaks out
the different types of analysis into individual procedures for a
selection application.  The different types of analysis are
attack, environmental, and cost.  Figure 6 presents the process
chart and description for this procedure.
4.3.1
Required Information.  The following information is
required for the system selection procedure:
a) Worksheets (See Appendix B):
1)  Cross-Section Selection (CSS)
2)  Frame Selection (FS)
3)  Anchorage Selection (AS)
4)  Wall Selection (WS)
4.4
System Evaluation Procedure.  This procedure breaks out
the different types of analysis into individual procedures for an
evaluation application.  The different types of analysis are
attack and environmental.  Figure 7 illustrates the process chart
and describes this procedure.