MIL-HDBK-1013/12
Table E-12
Actions for Example Number 4, Continued
Action
Action
Procedure
Figure Number
Structure
Number
Number
79
Record analysis results. Enter "1.902"
Results Analysis.
Figure C-19
<1>
and an "F" for failure. Press the "C" and
"Enter" keys. See Figure E-18.
80
Record maximum capacity. Press the
<2>
"G" and "Enter" keys. Enter "1.4656".
81
Did cross-section fail? Yes.
<3>
82
Modify cross-section to avoid failure.
<4>
Increase cross-section by 1/8". Cross-
section consists of !/4" and 1/8" layers.
83
Does cross-section require modification?
Safevue
Figure C-13
<8>
Yes.
Selection
Analysis
84
Select change from menu. Press the "K"
<9>
and "Enter" keys.
85
Do Plate Data Preparation procedure
<10>
86
For plate:
Plate Data
Figure C-18
<1>
87
Enter type of glazing material. Enter
Preparation
<2>
"Annealed Glass."
88
Is material glass? Yes.
<3>
89
Enter layer thicknesses. Enter "1/4"" and
<4>
"1/8"." See Figure E-18.
90
Enter total thickness of plate. Enter
<5>
"3/8"".
91
Enter total thickness of cross-section.
<6>
Enter "3/8"".
92
Repeat actions 53 through 82 for the modified cross-section.
Figure C-13
<8>
93
Does cross-section require modification? Safevue
No.
Selection
Analysis
94
Enter cross-section on worksheet. Enter
<9>
"3/8" AG" at the intersection of column
(c) and Laminated Glass row of the CSS
worksheet. See Figure E-14.
95
Repeat actions 28 through 94 for each cross-section: laminated polycarbonate, glass-clad
polycarbonate and glass-air gap with polycarbonate. See Figure E-19 through Figure E-21.
261