MIL-HDBK-1013/12
Table E-8
Actions for Example Number 4
Action
Action
Procedure
Figure Number
Structure
Number
Number
1
Selection Application? Yes.
System Analysis
Figure 5
<1>
2
Do System Selection procedure
<2>
3
Do Selection Attack Analyses procedure
System Selection
Figure 6
<1>
4
Do ballistics attack analysis? Yes.
Selection Attack
Figure 8
<1>
5
Do Ballistic Resistant Glazing Selection
Analyses
<2>
procedure
6
Select using threat severity level:
Ballistic Resistant
Figure 20
<1>
Medium.
Glazing Selection
7
Get cross-section to protect against
<3>
medium threat severity level. Use Table
9. See Figure E-14,
8
Get ballistic resistant frame thicknesses.
<6>
Use Table 6. See Figure E-15.
9
Get ballistic resistant wall thickness.
<7>
Use Table 7. See Figure E-16.
10
Do forced entry attack analysis? Yes.
Selection Attack
Figure 8
<3>
11
Do Forced Entry Resistant Glazing
Analysis
<4>
Selection procedure
12
Required level of protection? Medium.
Forced Entry
Figure 26
<1>
13
Use threat level severity level to select
Resistant Glazing
<2>
analysis: High.
Selection
14
Mark glazing system does not meet
<3>
design requirements. See Figure E-14.
15
Do bomb attack analysis? Yes.
Selection Attack
Figure 8
<5>
16
Do Blast Resistant Glazing Selection
Analysis
<6>
procedure.
17
For exterior tactic:
Blast Resistant
Figure 24
<1>
18
Required level of protection? High.
Glazing Selection
<2>
19
Do Safevue Selection Analysis
<4>
procedure
20
Create safevue data entry worksheet.
Safevue
Figure C-13
<1>
See Figure E-17.
Selection
21
Do Safevue Start Up procedure
Analysis
<2>