MIL-HDBK-1038
APPENDIX B
Sample Crane Information Form for
Underrunning (Single Girder) Crane(s)
Date__________
1.
PROJECT INITIATION LETTER ________________________________________________
2.
REQUIREMENT VALIDATED BY _________________________________________________
Name
Signature
3.
USING ACTIVITY ___________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
4.
BUILDING INFORMATION:
a)
Building name (and number) _________________________________________
b)
Room or area of crane location _____________________________________
5.
NUMBER OF IDENTICAL CRANES REQUIRED ______________________________________
(If cranes are not identical, prepare a separate form for each crane)
6.
RATED CAPACITY:
a)
Hoist/trolley unit _______ tons (short)
b)
Bridge _______ tons (short)
7.
CRANE DESIGN:
a)
CMAA #74 Class _______ bridge structure
b)
ANSI MH27.1 Class _______ bridge structure
c)
ANSI/ASME HST-4M Duty Class _______ hoist/trolley unit
Or
Approximate main hoist lifts per 8-hour shift:
Number
of
rated capacity lifts ___________________________________
Number
of
75 percent rated capacity lifts ________________________
Number
of
50 percent rated capacity lifts ________________________
Number
of
25 percent rated capacity lifts ________________________
b)
Desired speed ranges:
high/low (feet per minute)
Hoist _______
Trolley _______
Bridge _______
230