j) Are there any other conditions or operational requirements that should
be considered in the design and fabrication of the
crane(s)?___________________________________________________________________
____________________________________________________________________________
________________________________________________________________
15.
INSTRUCTIONS FOR CLEARANCE SKETCH AND FLOOR PLAN:
a) For a new runway (included in the crane contract), show the location and
maximum allowable loads (without impact) on the overhead support points.
b)
Show the transfer section locations and details.
c) If the particular runway girder is a structural section rather than
patented track beam, identify the section shape and grade of steel.
d)
Show the nominal compass directions.
e) Show the required load hook approaches at each end of runway and ends of
the crane bridge.
f)
Show runway girder bracing locations and description.