LANTNAVFACENGCOM A&E GUIDE
SAMPLE
CONTRACT A&E PROGRESS REPORT
To:
Commander
Attn: Code 03
Atlantic Division
Naval Facilities Engineering Command
1510 Gilbert Street
Norfolk, VA 23511-2699
Subj:
CONTRACT N62470-
, PROGRESS REPORT
PROJECT:
LOCATION:
1. The following represents the design progress of this project as of 15
,19
.
2. The contracted scheduled percentage complete as of the above date is
%.
The actual percentage complete is
%.
3. Our plan of action to correct the
% slippage is as follows: (COMPLETE AS
APPLICABLE)
4. The following outstanding actions/decisions should be resolved by
in order to maintain the current schedule:
5. Remarks: (COMPLETE AS APPLICABLE)
I certify that this report is accurate and complete
as of this date
,19
.
(Signature/Title)
SAMPLE
2-12