- Guide for Architect Engineer Firms Performing Services for the Atlantic Division
 - Record of Revisions
 - Forward
 - Forward -Cont.
 - Forward -Cont. 
 -  Index
 -  Index -Cont.
 -  Index -Cont.
 -  Index -Cont.
 -  Index -Cont.
 -  Index -Cont.
 -  Index -Cont.
 -  Index -Cont.
 - Section 1. Definitions and General Guidance
 - Definitions
 - Philosophy
 - Selection of Materials
 - Consultation Services
 - Consultation Services -Cont.
 - A & E Performance Awards
 - A & E Performance Awards -Cont.
 - Progress Payments
 - Progress Payments -Cont.
 - Instructions for Completing Contractor's Invoice
 - Naval Facilities Engineering Command Contractor's Invoice
 - Instruction for Completing Contract Performance Statement
 - Contract Performance Statement
 - Instructions for Completing Affidavit
 - Affidavit
 - Instructions for Completing Contractor's Release
 - Contractor's Release Under Contract
 - Section 2. Contractor Requirements
 - Scope
 - Conferences and Inspections
 - Site Information
 - Subsurface Conditions
 - Occupational Safety and Health Standards
 - Value Engineering
 - Value Engineering -Cont.
 - Shore Electronics Projects
 - Constructions and Operating Permits
 - Constructions and Operating Permits -Cont.
 - Contract A & E Progress Report
 - Section 3. Submittal Requirements
 - PEP Submittal
 - Exterior Architectural Design Submittal
 - Exterior Architectural Design Submittal -Cont.
 - 35% Station Presentation
 - 35% Station Presentation -Cont.
 - 35% Submittal
 - 35% Submittal -Cont.
 - 35% Submittal -Cont. 
 - 100% Submittal
 - 100% Submittal -Cont.
 - 100% Submittal -Cont.
 - Final Submittal
 - Final Submittal -Cont.
 - Quality Control Data
 - Quality Review Signature Block
 - Host Nation Approval 
 - Italian Law Compliance
 - Section 4. Basis of Design
 - Architectural
 - Structural
 - Site Plan
 - Asbestos,Lead Based Paint,and Toxic Waste
 - Asbestos,Lead Based Paint,and Toxic Waste -Cont.
 - Water Supply
 - Airfield Pavement
 - Dust and Erosion Control
 - Cathodic Protection & Protective Coatings
 - Cathodic Protection & Protective Coatings -Cont.
 - Physical Security
 - Mechanical Systems
 - Heating,Ventilation and Cooling
 - Heating,Ventilation and Cooling -Cont.
 - Heating,Ventilation and Cooling -Cont.
 - Energy/Solar Analysis
 - Energy Conservation Methods
 - Heating Plants and Heating Plant Additions
 - Fuel Distribution and Storage
 - Outside Design Temperature LANTNAVFACENGCOM Activities
 - Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
 - Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
 - Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
 - Outside Design Temperature LANTNAVFACENGCOM Activities -Cont.
 - Guidelines for Using Building Design Energy Target
 - Energy Analysis
 - Solar Analysis
 - Project Summary Data for Mechanical Systems
 - Fire Protection Systems
 - System Safety
 - Electrical Systems
 - Electrical Systems -Cont.
 - Electronic Systems
 - Electronic Systems -Cont.
 - Electronic Systems -Cont. 
 - Table 4.8.2.1 EMCS Protections in LANTNAVFACENGCOM: Current Status
 - Instrumentation and Control Systems
 - Sizes of Drawings/Sketches
 - Graphic Scales
 - Lettering and Shading
 - Title Blocks
 - Material Symbols on Drawings
 - Common Discrepancies in Nomenclature
 - Metric Dimensioning
 - Section 6. Specifications
 - References
 - Specifying New Materials
 - Pre-Qualification Statements and Experience Requirements
 - Phraseology
 - Misuse of Words
 - Use of Abbreviations and Symbols
 - Submittal Procedures
 - Sample Outline Specification
 - Sample Outline Specification -Cont.
 - Sample Outline Specification -Cont.
 - Sample Outline Specification -Cont.
 - 100% Submittal (Complete Specifications)
 - Bid Items
 - Federal and Military Specifications
 - Section 7. Cost Estimates
 - 35% Design
 - 100% Design
 - Estimates for Negotiated Construction Contracts
 - Estimates for Projects Located Outside Conus
 - Estimates for Protects Located in Iceland
 - Section 8. Post Design Services
 - Basis of Payment for Reimbursable Consultation
 - Request for Consultation
 - Consultation Reports
 - Design Field Support
 - Number of Site Visits
 - A & E Tasks and Responsibilities for Design Field Support
 - Shop Drawings/Submittal Review
 - Stateside Contracts
 - Submittal Flow Chart 1(without OMSI)
 - Submittal Flow Chart 1-0(without OMSI)
 - Submittal Flow Chart 2(without OMSI)
 - Submittal Flow Chart 2-0(without OMSI)
 - Overseas Contracts
 - Overseas Contracts -Cont.
 -  Reservation of Review and Approval by the Government of Contractor Submittals
 - Architectural
 - Structural
 - Structural -Cont.
 - Structural -Cont.
 - Mechanical
 - Mechanical -Cont.
 - Electrical
 - Electrical -Cont.
 - Government is Approving Authority
 - Government is Approving Authority -Cont.
 - Miscellaneous Submittal Review Aspects
 - Interior Design (Option)
 - Scope
 - Development Sequence and Submittal Requirements
 - Operation and Maintenance Support Information (OMSI)
 - Operation and Maintenance Support Information (OMSI) -Cont.
 - Operation and Maintenance Support Information (OMSI) -Cont.
 - Cathodic Protection System Inspection,Testing and Acceptance (Option)
 - Cathodic Protection System Inspection,Testing and Acceptance (Option) -Cont.
 - Electrical Design Guide
 -  Table of Contents
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 -  Table of Contents -Cont.
 - Figures
 - Appendixes
 - Drawing Format
 - Required Calculations
 - Riser Diagrams
 - Fire Alarm Riser Diagram
 - Multiple Conduct/Cable Runs
 - Asbestos
 - Scheduling and Sequencing Construction Contracts
 - Government Furnished Equipment
 - Breaker/Relay Settings
 - Manholes and Handholes
 - General Rules
 - Pole Plates and Conductors
 - Fuse Protection
 - Techniques for Minimizing Voltage Drop
 - Equipment Rating
 - Emergency Lights,Exit Lights, and Fire Protection Systems
 - Grounding Systems
 - Cable Shields
 - Regulators
 - Capacitors
 - Switch Gear
 - Panel Board Schedules
 - Switchboards and Switchgear
 - General Guidelines
 - Fixture Details
 - HVAC Equipment
 - Selection Guidance
 - Motor Control Centers
 - Automatic Standby Power Systems
 - Figure 1. One-Line Diagram
 - Figure 2. One -Line/Riser Diagram
 - Figure 4. Underground or Single Grounded Primary System -without Surge Arresters
 - Figure 6. Multi-Grounded Primary System (Delta-Wye)-without Surge Arresters
 - Figure 8. Multi Grounded Primary System (WYE-WYE)-Without Surge Arresters
 - Telecommunications Coordination and Responsibility Chart
 - Panelboard MDP Schedule
 - Figure 12. Lighting Fixture Schedule
 - Figure 13. Electrical Plan of Above
 - Figure 14. Electrical Plans of Above
 - Figure 15. Electrical Plans of Above
 - Appendix A Electrical Guide Legend-(Interior)
 - Appendix A Electrical Guide Legend-(Interior) -Cont.
 - Appendix A Electrical Guide Legend-(Interior) -Cont. 
 - IDS Symbols
 - Abbreviations
 - Abbreviations -Cont.
 - Appendix B Electrical Guide Legend-(Exterior Underground)
 - Appendix B Electrical Guide Legend-(Exterior Underground) -Cont.
 - Abbreviations
 - Appendix C Electrical Guide Legend-(Exterior- Overhead)
 - Appendix C Electrical Guide Legend-(Exterior- Overhead) -Cont.
 - Appendix C Electrical Guide Legend-(Exterior- Overhead) -Cont.
 - Appendix C Electrical Guide Legend-(Exterior- Overhead) -Cont.
 - Appendix D Electrical Guide Legend (One-Line Diagrams)
 - Appendix D Electrical Guide Legend (One-Line Diagrams) -Cont.
 - Typically Used ANSI Control Function Symbols
 - Abbreviations
 -  Blank Page
 -  Blank Page
 -  Blank Page
 -  Blank Page
 -  Blank Page
 -  Blank Page
 -  Blank Page
 
 Guide for Architect Engineer Firms Performing Services for the Atlantic 
Division 
 
  | 
			
 
 
 
 
   
  |