Custom Search
|
|
|
||
LANTNAVFACENGCOM A&E GUIDE
4/17/93
Job Order No.:
Date:
LANTDIV Reviewer:
Prepared By:
PROJECT SUMMARY DATA FOR MECHANICAL SYSTEMS
1.
Project Title and Location:
Cat Code
FY-
P-
2.
Total Project Construction Cost $
New Structure
3. Building Type:
Administration
Renovation
Applied Instruction
Addition
Barracks
Other (note)
Industrial
Institutional
4.
Building Conditioned Floor Area
Sq. Ft. (A/C)
Sq. Ft. (Heated and A/C)
Sq. Ft. (Heated) or
5.
Air conditioning System Description - (DX Split System, Air Cooled Recip Chiller, etc.)
a. Total Tons
GPM/Ton (Chilled Water)
b. Total Sq. Ft./Ton
GPM/Ton (Cond. Water)
6.
Air Conditioning System Description - Airside
(Constant Volume, FPVAV, etc.)
a.
Total
CFM
Vent (O.A.) CFM/SF
b.
(Vent
(O.A.) CFM
Vent (O.A.) CFM/Person
c.
Total
CFM/Sq. Ft.
d.
Total
CFM/Ton
7.
Heating System Description
(District Steam, Oil Fired Boiler, etc.)
a. Capacity MBH
b. BTUH/Sq. Ft.
8. Design Data
Summer
OADB
Lights
Winter OADB
Summer
OAWB
Winter IADB
Watts/SF
Summer
IADB
Wall "U" Valve
Summer
IARH
Glass "U" Valve
Roof "U" Valve
Form MS-1
4-29
|
||