Custom Search
   
 | 
      
         | 
 
       | 
		||
        ![]() LANTNAVFACENGCOM A&E GUIDE 
4/17/93 
Job Order No.: 
Date: 
LANTDIV Reviewer: 
Prepared By: 
PROJECT SUMMARY DATA FOR MECHANICAL SYSTEMS 
1. 
Project Title and Location: 
Cat Code 
FY- 
P- 
2. 
Total Project Construction Cost $ 
New Structure 
3. Building Type: 
Administration 
Renovation 
Applied Instruction 
Addition 
Barracks 
Other (note) 
Industrial 
Institutional 
4. 
Building Conditioned Floor Area 
Sq. Ft. (A/C) 
Sq. Ft. (Heated and A/C) 
Sq. Ft. (Heated) or 
5. 
Air conditioning System Description - (DX Split System, Air Cooled Recip Chiller, etc.) 
a. Total Tons 
GPM/Ton (Chilled Water) 
b. Total Sq. Ft./Ton 
GPM/Ton (Cond. Water) 
6. 
Air Conditioning System Description - Airside 
(Constant Volume, FPVAV, etc.) 
a. 
Total 
CFM 
Vent (O.A.) CFM/SF 
b. 
(Vent 
(O.A.) CFM 
Vent (O.A.) CFM/Person 
c. 
Total 
CFM/Sq. Ft. 
d. 
Total 
CFM/Ton 
7. 
Heating System Description 
(District Steam, Oil Fired Boiler, etc.) 
a. Capacity MBH 
b. BTUH/Sq. Ft. 
8. Design Data 
Summer 
OADB 
Lights 
Winter OADB 
Summer 
OAWB 
Winter IADB 
Watts/SF 
Summer 
IADB 
Wall "U" Valve 
Summer 
IARH 
Glass "U" Valve 
Roof "U" Valve 
Form MS-1 
4-29 
 | 
			![]()  | 
		|
![]()  | 
		||