Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


LANTNAVFACENGCOM A&E GUIDE
4/17/93
SOLAR ANALYSIS
1.
Input Information (Prepared by A&E)
A&E CONTRACT NO.: N62470- -B-
Construction Contract No.: N62470- -B-
P-NO
Project Title:
FY
Location:
Person to Contact (Name):
Telephone:
Escalation Dates:
Contract Award - Month
Year
B.O.D.
- Month
Year
Contingency
%
Type System (DHW/Space Heating)
Domestic Hot Water Demand:
Gal. Per day required -
Ga. Per hour recovery required
Back-up Energy Source:
Oil
Steam:
Electric:
Gas
Oil
On Peak
Other
Coal
Off Peak
Building Floor Area Sq. Ft.
Number of People:
Compass Direction of Collector-Normal
II.
Results (LANTNAVFACENGCOM)
A.
For projects at locations other than Bermuda, Central America, Cuba, Puerto Rico, and other
Caribbean Islands:
In view of recent past studies for active solar utilization at this location which clearly
indicated Solar Energy not to be feasible, solar was not studied for this specific project.
B.
For projects at Bermuda, Central America, Cuba, Puerto Rico, and other Caribbean Islands:
A life cycle cost solar analysis was performed by LANTNAVFACENGCOM. Results
indicate that solar energy is not feasible for this project.
A life cycle cost solar analysis was performed by LANTNAVFACENGCOM. Results
indicate system is cost effective. The following information applies:
Solar Design cost ($000)
SIR
Collector Area (SF)
Discount Payback (years)
Solar System Cost ($0000)
Annual Energy Saved (MBTU)
Energy Contribution from Solar System, %
III.
This completed form shall be included in the basis of design 35% submittal.
LANTNAVFACENGCOM Approved:
Name
Date
Form S-1
4-28








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business