LANTNAVFACENGCOM A&E GUIDE
4/17/93
8.3.1.2 OVERSEAS CONTRACTS -
The construction contractor for the referenced project has been instructed to
forward to your office for review all shop drawings, manufacturer's data, certifications
and samples, except those designated for LANTNAVFACENGCOM's approval, as
follows:
TRANSMITTAL
SUBMITTAL SAMPLES
FORM
7
7**
As Specified
**Three sets for OMSI Manuals.
A. Acceptable submittals requiring no revisions by the reviewer. If the
submittal complies with the contract requirements, it should be noted on the transmittal
form that the contractor's approval appears to be appropriate. The submittal should
not be stamped and action code "RA" should be placed in the appropriate block on the
transmittal form. The reviewer's section of the transmittal form shall be completed and
both transmittal form and submittals distributed as follows:
TRANSMITTAL
FORM
SUBMITTAL SAMPLES
Contractor
0
0
ROICC
2
2
1
LANTNAVFACENGCOM
1
1
0
(Code 05)
1
A&E
4**
0
**Three sets for OMSI Manuals.
8-14