LANTNAVFACENGCOM A&E GUIDE
4/17/93
(2) Marked 100% estimate
(3) Vendor/manufacturer quotes
(b) Manual Estimates
(1) Backup estimate with summary sheet(s)
(2) Marked 100% estimate
(3) Vendor/manufacturer quotes
(c) Proposed bid items with detailed backup estimate (if estimated
construction cost exceeds construction funds available).
(5) Calculations.
(6) All marked materials returned with previous submittal.
(7) Field Notes, Reports and Studies.
(8) Environmental Construction and/or Operating Permit(s).
(9) All NAVFAC DMs furnished by LANTNAVFACENGCOM at project
commencement.
NOTE: ALL COMPUTATIONS, STUDIES AND OTHER SIGNIFICANT
MATERIAL SHALL BE BOUND IN BOOK FORM.
C. QUALITY CONTROL DATA: Your firm will be expected to perform a
quality control review. This review will evaluate both the technical accuracy and
discipline coordination. Your Final Submittal shall include a single set of final prints
and specifications highlighted to indicate that the review was performed and
corrections made and a signature in the "Quality Review Signature Block" (see below)
on the original of the cover sheet of "F" size drawings or on the "Quality Control" line in
the title block of the cover sheet of "D" size drawings, indicating a quality review was
performed. Such items as section, detail, and note references to other sheets, major
dimensions, and equipment locations shall be marked. Verify that all equipment is
correctly identified the same way on all sheets and in the specifications. Ensure that all
work as indicated on the drawings is fully and consistently specified.