4/17/93
LANTNAVFACENGCOM A&E GUIDE
C. Final inspection and testing of cathodic protection systems, approximately
30 days after construction contractor's report submittal, to verify the contractor's report
and insure structure protection levels are in accordance with National Association of
Corrosion Engineers (NACE) recommended practices.
D. Confirmation of interference current mitigation to other structures.
E.  Provide ROICC with "punch list" of construction contractor deficiencies on
the installation of the cathodic protection systems.
F.  Prepare a final inspection report noting all test results to document levels
of cathodic protection throughout the structure and to establish baseline parameters.
8-35