MECHANICAL (Cont'd)
100%
35%
All elements of design shown have
k.
been coordinated with other
disciplines participating in this
design package . . . . . . . . . . . . . . . .
Materials and equipment shown are
l.
either readily obtainable, or, long
lead items are clearly indicated
together with lead time requirements.
m.
Equipment systems components and/or
building materials specified are most
economical to satisfy project
requirements . . . . . . . . . . . . . . . . . . . . .
Plumbing:
3.
a.
Number of plumbing fixtures shown is
proper . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
b.
Size of supply and drain lines are in
accordance with fixture unit method
(National Plumbing Code)............
c.
Type of water pipe, soil pipe, stacks,
etc. shown are most economical and
properly  indicated..................
d.
Plumbing fixture locations agree with
architectural . . . . . . . . . . . . . . . . . . .
e.
Plumbing fixtures shown in plumbing
schedule and are properly specified . .
f.
Wall chases are shown on architectural
plan to conceal vertical plumbing...
4.
Piping:
a.
New gasI water, sewer, steam,
condensate return lines are
connected to existing lines and
fixtures . . . . . . . . . . . . . . . . . . . .
b.
Existing water and steam supply
systems capacity and pressure is
adequate after modification.........