COST ENGINEERING
100%
35%
Cost escalation/bidding climate was
1.
considered and logic provided...........
2.
Cost is consistent with project scope...
3.
Statutory and other cost limitations
were considered . . . . . . . . . . . . . . . . . . . . . . . . .
4.
Built-in equipment, installation of
collateral equipment and connection of
utilities were considered in building
costs . . . . . . . . . . . . . . . . . . . . . . . . . . .
5.
Raised floor, high ceiling, shielded
room and special foundations were
included . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6. Demolition and/or relocation of existing
facilities were included, including
salvage value . . . . . . . . . . . . . . . . . . . . . . . . . . .
7.
Security requirements, if any, were
considered . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8.
Project Location was considered.........
Other Factors:
9.
Work in crawl space.................
a.
b.
Work with special care..............
c.
Work and maintain quiet.............
Interference by occupants ...........
d.
e. Work in foul environment ............
Special safety requirements .........
f.
Work with other contractor/shop
g.
forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Provide for temporary utilities/HVAC.
h.
Overtime to support compressed
i.
schedules . . . . . . . . . . . . . . . . . . . . . . . . . . .
10.
Shipping problem/Supply problems
considered. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11.
No more than three additive bid items
are shown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
|
||