REVIEWERS
INITIALS AT:
SPECIFICATIONS (Cont'd)
35%
100%
Materials indicated are identical with
15.
those shown on drawings.................
Construction contract and specification
16.
number shown as indicated in "SCOPE" and
specification number appears on each
sheet of specification..................
Door hardware schedule identified.......
17.
Drawing title numbers and NAVFAC drawing
18.
numbers are shown exactly as they appear
on the drawings.........................
All specifications referenced in
19.
contract specification are available and
current . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20.
Specification prepared in accordance
with guidance established in A-E Guide..