Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


SAMPLES
Sample #1
-
Detailed Material and Labor System Component Backup
Sheet (using Lotus Spreadsheet file "BACKUP.WK1")
(Computerized version of NAVFAC Form 11013/7 (1-78))
Sample #2
-
System Cost Backup Sheet based on CES Unit of Measure
(using Lotus Spreadsheet file "BACKUP2.WK1")
(Computerized version of NAVFAC Form 11013/7 (1-78))
Sample #3
-
Markup Summary Sheets (3 pages long)
(using Lotus Spreadsheet file "MARKUP.WK1")
Sample #4
-
Building Budget Estimate Summary Sheet (2 pages long)
(using Lotus Spreadsheet file "SUMMARY.WK1")
Sample #5
-
Cost Analysis Sheet (2 pages long)
(using Lotus Spreadsheet file "ANALYSIS.WK1")
Sample #6
-
Cost Tracking Sheet (2 pages long)
(using Lotus Spreadsheet file "TRACK.WK1")
Sample #7
-
Checklist of Overhead Cost Items (3 pages long)
(using Lotus Spreadsheet file "OVERHEAD.WK1")
(NOTE:
HIGHLIGHTED AREAS ON SAMPLES INDICATE INFORMATION TO BE ENTERED BY
THE A/E WHEN USING THE LOTUS SPREADSHEET FILES.  REMAINING
INFORMATION IS CALCULATED BY THE PROGRAMMED CELL FORMULAS.  ALL
INFORMATION MUST BE ENTERED WHEN MANUALLY PREPARING THESE SHEETS.)
12 -








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business