Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


(\ljv\wpdata\misc\navy\afest.2)
PREPARATION OF CONSTRUCTION COST ESTIMATE
FOR  AIR  FORCE  PROJECTS
10/2/89
1 of 2
Ref (a) A/E G U I D E
The Construction Cost Estimate is to be provided in a separate
booklet in accordance with Ref a ( o r as otherwise directed by the
NORTHDIV Design Manager) and the following additional
requirements:
1) The estimate shall be projected to the anticipated mid-point
of construction based on a construction start date to be
obtained from NORTHDIV - PM Code 0 9 A 2 2 2 Intent is to use the
anticipated date of Construction Contract Award + 15 days as
the Construction Start Date.
2) An Air Force Form 1178 (Project Cost Estimate Worksheet1 shall
be completed and provided with each submission for each Bid
Item. Only the following "Blocks" are to be filled in:
- 1.
- 2.
(obtain from NORTHDIV PM - Code 0 9 A 2 2 2 )
- 4.
AF PDC No.  (obtain from NORTHDIV`PM - Code 09A222)
- 7.
(obtain from NORTHDIV PM - Code 09A222)
- 8.
-11.
-12.
-13.
AE Contract No. and N A V F A C
Project No.
-14.
Code 09A222)
(obtain from NORTHDIV PM -
-15.
(obtain from  NORTHDIV PM'-
Code 09A222)
-16.
(obtain from NORTHDIV PM -
Code 09A222)
-19.
-20.
-21 .
-22.
-23.
(if applicable)
-24.
(if applicable)
-25.
(only applicable if project is split funded) provide
separate backup; should be projected to anticipated
mid-point of construction; also include and separately
itemize these costs in summary provided in Blocks 27
through 43
-27.
-28
-29:
-30.
-31.
-33.
-34.








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business