(\ljv\wpdata\misc\navy\afest.1)
PREPARATION OF CONSTRUCTION COST ESTIMATE
FOR AIR FORCE PROJECTS
10/2/89
2 of 2
cont
2)
-36
-37
-38
-39.
-40.
-42.
-43.
-44.
-45.
Only applicable if project site is not in United States
-46.
Set equal to 1.00
-48.
Value determined in Block 52
-49.
Set equal to 1.00
-50.
-51.
The Cost Growth Factor should be consistent with
-52.
NORTHDIV guidance. The denominator should include as a
minimum the month/year of the cost data the estimates
entered in blocks 33 & 42 are based on. The numerator
should include as a minimum the month/year to which the
cost estimates entered in Blocks 3 4 43, and 54 are
projected to.
-54.
NOTE: DO NOT FILL IN BLOCKS 47, 53, 55, 56, 57, 56, OR 59