AIR FORCE
ENERGY REPORT
PURPOSE: This consolidated format will be used by designers (A-E firms and/or
design agents - Corps of Engineers or Naval Facilities Engineering Command) to
report to AFRCE-ER applicable energy information for any particular design.
The AFRCE-ER project managers will use this format to place data on WANG
computer for dissemination to HQ USAF, MAJCOM, and base levels. The report
has three Parts. Part I is for most projects - the energy budget figure (EBF)
is the design energy consumption for a facility. Part II is for ECIP projects
only. Part III is for solar features (active or unique passive) and would be
used in conjunction with Part I, as applicable. This report format replaces
DEACONS Worksheets Options C, D, and E for ENESEG 1, 2, and 3 used in past FY
1981 - 1985 projects and same FY 1986 projects started prior to publication of
this attachment. (This format is not retroactive.)
PART1
DESIGN STATUS:
%
DATE:
ENERGY BUDGET FIGURE (EBF)
1. EBF 1 (DOD target to design within found in ETL 86-1) given in BTU/SF/YEAR
...................................
2. EBF 2 (budget designer has calculated for facility designed to 30 percent
or further, excluding process loads, using ETL 86-1 operating times)
BTU/SF/YEAR . . . . . . . . . . . . . . . . . . . . . . . . . . .
3. EBF Heating: That portion of EBF 2 designer credits to heating facility
only in BTU/SF/YEAR . . . . . . . . . . . . . . . . . . . . . .
4. EBF Cooling: That portion of EBF 2 designer credits to cooling facility
in BTU/SF/YEAR . . . . . . . . . . . . . . . . . . . . . . . . . .
5. EBF Ventilation: That portion of EBF 2 designer credits to ventilation.
When the HVAC load includes only unconditioned air, it may be designated as
ventilation, in BTU/SF/YEAR . . . . . . . . . . . . . . . . . .
6. EBF Lighting: That portion of EBF 2 designer credits to lighting facility
in BTU/SF/YEAR . . . . . . . . . . . . . . . . . . . . . . . . .
7. EBF Domestic Hot Water: Portion of EBF 2 calculated to be the result of
producing domestic hot water in BTU/SF/YEAR. . . . . . . . . .
8. EBF 3 (Budget designer has calculated for facility designed to 30 percent
or further, including process loads, using actual or expected operating
times. Hot water requirements for gymnasiums, cafeterias and commissaries
will be considered process loads.) BTU/SF/YEAR. . . . . . .
9. Operating Times: Actual or expected facility operational hours that were
used in analysis to calculate EBF 3.
Hrs/Day . . . . . . . . . . . . . . . . . . . . . . . . . . .
Days/Wk . . . . . . . . . . . . . . . . . . . . . . . . .
1 of
Attachment 22C
1 of 5