[Amendment No. ____ to]
Appendix "A"
Code 40__/____
N62472-__-C-____
Date (Revised)
[AMENDMENT NO. ____ TO]
APPENDIX "A"
STATEMENT OF ARCHITECT-ENGINEER (A/E) SERVICES
UNDER
[INDEFINITE QUANTITY] A/E CONTRACT N62472-____-C-________
[VARIOUS REPAIRS/ALTERATIONS/NEW CONSTRUCTION PROJECTS
STATES OF ________________________________]
PART 1 - GENERAL INFORMATION
1.1
General Statement of Services
[Appendix "A" Statement of Architect-Engineer (A/E) Services dated ______________ is
amended as follows:]
[Amendment No. ____ of _______________ to Appendix "A" Statement of Architect-Engineer
(A/E) Services dated _______________ is amended as follows:]
The A/E shall provide services in accordance with the requirements, schedules, guidance
and information contained or referenced herein for the project[s] listed below. All
contract requirements shall be performed in accordance with the procedures outlined in the
"Guide for Architect-Engineer Firms Performing Services for the Northern Division, Naval
Facilities Engineering Command" dated 31 December 1991 including Revisions [NONE]
(hereinafter referred to as the "A/E Guide"). By such reference, the A/E Guide shall form
a part of this contract:
[ADD] [REVISE] PROJECT NO: ________
PROJECT TITLE:
___________________________________________
PROJECT LOCATION: ___________________________________________
CONSTRUCTION CONTRACT #: N62472-____-C-________
ESTIMATED CONSTRUCTION COST (ECC): $________________ [REVISED]
FY ____ FUNDS ______ JO # ____________ CAT CODE ________
ANTICIPATED DATE OF CONSTRUCTION CONTRACT AWARD (ADCA): ______
1.2
Project Information [for Project No. _____]
1.2.1
Project Description
1.2.2
Special Project Requirements/Criteria/Information
In addition to the criteria, guidance and information listed under Part 5, "Applicable
Criteria, Guidance and Information," of this Appendix, the A/E's attention is directed to
the following special project specific requirements, criteria and information:
1.2.2.1
Architectural:
Handicapped accessibility [is required] [is not required].
1.2.2.2 Structural:
[Design for seismic zone ____ is required.][Design for seismic is
not required.]
1.2.2.3
Mechanical:
(1)
[The facility shall be designed to meet an Energy Budget of ____________
BTU/SF/Year. The A/E shall calculate the energy consumption of this facility
on a BTU/gross SF/year basis.] [The facility shall be designed to reduce energy
N62472-XX-X-XXXX
1