I. PACNAVFACENGCOM DESIGN REVIEW CHECKLIST
Project Title:__________________________________________________________________
______________________________________________________________________________
Reviewer's
60%  _________________________________
Date: __________________
Signature:
100% _________________________________
Date: __________________
Review Item
Yes * No
N/A
Specifications
General
1.
Bidding Information Sheet corresponds to bid item.
2.
Specifications are based on latest NFGS listed in SPECSINTACT Table
of Contents of CCB.
3.
Items identified in specifications such "as shown" and "as indicated" for
storage areas, borrow areas, temporary buildings, etc. have been
coordinated with drawings.
4.
Specifications are in conformance with the basis of design and
drawings.
5.
Project Information Form for 100% and Final Submittals completed
for use by Contracts Office (R110). Refer to PACNAVFACENGCOM
A-E Guide, P-74, Section 8, "Specifications" for a sample copy.
Section 01110, Summary of Work
1.
Contract completion time is reasonable based on such items as long
lead materials/equipment, location of project site, and size of project.
2.
Construction categories listed for MILCON projects.
3.
Photograph requirements discussed with ROICC or Activity and
paragraph included/deleted as appropriate.
Section 01450, Quality Control
1.
Administrative items are identified as Government approved.
2.
U.S. registered fire protection engineer reviews fire protection
submittals.
*Note: Provide explanation for "No" responses.