- A-E Guide for Architect -Engineer Firms Performing Services
- Record of Revisions
- Foreword
- Table of Contents
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Table of Contents -Cont.
- Appendices
- Appendices -Cont.
- Section 1. General Information
- Definitions
- Background
- Preliminary Plans, Specifications and Cost Estimates: Preliminary
- Intrusion Detection System (IDS)
- Post Construction Award Services (PCAS)
- Indefinite-Quantity (IQ) Contracts
- Job Order Contract (JOC)
- Other Award Programs
- PACNAVFACENGCOM Consultants
- Transition to Metric
- FOSSAC on Supply and Warehouse Facilities
- Geographic Area of Responsibilty
- Heavy Outline Indicates Key New Positions
- Section 2. General Performance Requirements
- Correction of Deficiencies in Design
- Inspection of Testing Laboratories
- Authorized Contracting Officers
- Security Clearances
- Authorized Contacts
- Copies of Information
- Payments
- Section 3. Design Submittals and Reviews
- Concept Submittal
- Final Submittal
- Electronic Bid Solicitation (EBS)
- List of Construction Contractor Submittals
- Critical Items Summary
- Quality Control Submittals
- Government Reviews
- Submission of Annotated Review Comments
- Section 4. Post Construction Award Services (PCAS)
- Types of Services
- Operation and Maintenance Manuals
- Office Consultation
- Preconstruction Conference
- Designer/ROICC Conference
- Title II Inspection and Surveillance Services
- Section 5. Basis of Design
- Value Engineering Database (VEDIS)
- Base Exterior Architecture Plan (BEAP)
- Design Computations
- Environmental Policies
- Notification of Demolition and Renovation
- Physical Features
- Site Adaptation of Standard or Working Drawings
- Sustainability/Recycling/Green Building
- Design for the Physically Handicapped
- Civil Engineering
- Water Supply and Distribution
- Adequacy of Existing Utilities
- Airfield Pavements
- Activity Master Plan For Landscaping
- Architectural
- Wall Finish Selections and Vapor Barrier Placement
- Wind Design Policy
- Mechanical
- Air Conditioning
- Fuel Storage and Distribution
- Electrical
- Exterior Distribution Systems
- Communications-Electronics System Basic Requirements
- Telephone/Communications Installation
- Utility Connections and Interruptions
- Physical Security
- Engine Generators
- Quality Assurance
- Notification of Demolition and Renovation
- Notification of Demolition and Renovation -Cont.
- Basic Elevator Hoistway Dimensions For Design Purposes
- Basement Geared Traction
- Basement Underslung, 2:1 Geared Traction
- Basement Underslung, 2:1 Geared Traction -Cont.
- State of Hawaii Elevator Code Criteria Applicable to Navy Elevators in Hawaii
- State of Hawaii Elevator Code Criteria Applicable to Navy Elevators in Hawaii -Cont.
- State of Hawaii Elevator Code Criteria Applicable to Navy Elevators in Hawaii -Cont.
- Elevator Fire Protection Requirements
- Communications Systems Cabling
- Memorandum of Understanding
- Responsibilities
- Responsibilities -Cont.
- Responsibilities -Cont.
- Cathodic Protection Systems,Interim Technical Guidance
- Technical Guidance
- Action
- Distribution
- Interim Design Criteria EM Cathodic Protection Systems
- Interim Design Criteria EM Cathodic Protection Systems -Cont.
- Interim Design Criteria EM Cathodic Protection Systems -Cont.
- EFD Points of Contact for Corrosion Control
- Section 6. Soils,Investigations,Field Surveys, Color Renderings, and Interior Design Services
- Subsurface Investigation
- Soil Testing and Earthwork Standards
- Geochemical Evaluation
- Field Surveys
- Color Renderings
- Mandatory Procurement Sources
- Section 7. Project Drawings
- Preliminary Furniture Layouts
- Systems
- Electrical Systems
- Survey Control
- Basic Working Stresses
- Scales
- Plot Plans and General Layouts
- Drawing Revisions
- Formal Approval of Revised CADD Generated Drawings
- Arrangements of Drawings
- Professional Registration Stamp
- Section 8: Project Specification
- Magnetic Media Requirement
- Proprietary Specifications
- Experience and Warranty Clauses
- Warranty Clauses
- Combining Guide Specifications
- Commercial Item Description (CIDs)
- Section Format
- General Rules for References
- General Rules for References -Cont.
- Subject/Verb Agreement
- Listing Multiple Requirements
- Open-Ended Requirements
- Vocabulary
- Compound Words
- Commonly Confused Spellings
- Symbols, Abbreviations, and Acronyms
- Coordination with Construction Contract Clauses (Appendix V)
- Contractor Direction
- Bidding Information
- Sequence of Corrections
- Adding a Section
- Replacing or Adding Pages
- Revising Drawing
- Written Changes to Drawing
- Noncommercial Computer Software
- DD Form 1423 Instructions
- DD Form 1423 Instructions -Cont.
- Attachment A
- Contract Data Requirements List
- Instructions for Completing DD Form 1423
- Department of the Navy Pacific Division Naval Facilities Engineering Command
- Project Information Form Required for 100% and Final Submittals
- Project Information Form Required for 100% and Final Submittals -Cont.
- Information for Document 00710
- Refer to the "Liquidated Damages" Tables Attached at the End of This Form
- Additional Information for Contract Specialist
- NonCommercial Computer Software
- Ozone Depleting Substance Certification Statement
- Liquidated Damages
- Table 4: Storage Space
- Bid Schedule
- Price Proposal Schedule
- Price Proposal Schedule for Various Fuel Projects
- Bid Schedule
- Section 9. Cost Engineering
- Multiple Facilities with Multiple Types of Work
- Material and Equipment Listings
- Submission Requirements
- Schematic Design Submission
- Contract Modification Estimates
- International Balance of Payments (IBOP) Summary
- Web System Descriptions
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Web System Descriptions -Cont.
- Summary Report
- Summary Report -Cont.
- Fire Protection
- Electrical
- Tunnel
- Mechanical Demolition
- Contractor Mark-Up Report
- Project Cost Estimate Summary
- Sample Basis of Estimate
- NAVFAC Construction Cost Index Historical and Projected
- Cover Sheet/Check List for TEAM 1391 (+) and PCEs
- Military Construction Project Data
- Military Construction Project Data -Cont.
- Military Construction Project Data -Cont.
- Supplemental Data
- Supplemental Data -Cont.
- Technical Operating Manuals
- Budget Estimate Summary Sheet
- Vicinity Map
- Site Plan
- Existing First Floor Plan
- Existing First Floor Plan
- Existing First Floor Plan -Cont.
- Proposed Floor Plan (layout)
- Service/Center Wing Plan
- Electrical One Line-Digram
- Site Plan
- Existing Floor Plan
- Existing Floor Plan -Cont.
- Proposed Floor Plan
- Proposed Floor Plan (Layout)
- Site Plan
- Electrical One Line Diagram
- Site Plan
- BLDG 1370 Electrical One Line Diagram
- Executive Summary Report
- Executive Summary Report -Cont.
- Life Cycle Cost Report
- Life Cycle Cost Report -Cont.
- Lease Bachelor Enlisted Quarters (Hotel Rooms)
- Pay Housing Allowance
- Source and Derivation of Costs and Benefits
- Source and Derivation of Costs and Benefits -Cont.
- Source and Derivation of Costs and Benefits -Cont.
- Facilty Planning Document
- BFR Justification
- Final Determination of Bachelor Housing Requirements
- Final Determination of Bachelor Housing Requirements
- Cost Estimate
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Cost Estimate -Cont.
- Elements of the "Parametric Cost Estimate"
- Proposal/Estimate for Contract Modification
- Instructions for Preparing Proposal/Estimate For Contract Modification
- Sample Completed Subcontractors List
- Wage Rate Calculations
- Proposal/Estimate for Contract Modification
- Detailed Cost Estimate Worksheet
- Section 10. Special Requirements for Overseas Work
- Local Mensuration System/Metric Policy
- Architect-Engineer and Related Services Questionnaire
- Architect-Engineer and Related Services Questionnaire -Cont.
- Experience Profile Code Numbers For Use with Questions 10 and 11
- Architect -Engineer and Related Services Questionnaire
- Architect -Engineer and Related Services Questionnaire -Cont.
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project -Cont.
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect -Engineer and Related Services Questionnaire for Specific Project
- Architect-Engineer Contract
- Architect-Engineer Contract -Cont.
- Clauses (Architect -Engineer Contracts Division)
- Federal Acquisiton Regulator (FAR)
- Contract Clauses
- Contract Clauses -Cont.
- Contract Clauses -Cont.
- Contract Clauses -Cont.
- Contract Clauses -Cont.
- Contract Clauses -Cont.
- Department of Defense Federal Acquisition Regulation Supplement (DFARS)
- Contract Clauses
- Contract Clauses
- Contract Clauses -Cont.
- Contract Clauses -Cont.
- Navy Acqusition Procedures Supplement (NAPS)
- Naval Facilities Engineering Command Contracting Manual
- Contract Clauses
- Federal Acquisition Regulation (FAR)
- Notification of Ownership Changes
- Order Limitations
- Subcontracts for Commercial Items and Commercial Components
- Department of Defense Federal Acquisition Regulation Supplement (DFARS)
- Antiterrorism/Force Protection Policy for Defense Contractors Outside the United States
- Navy Acquisition Procedures Supplement (NAPS)
- NAVAL Facilites Engineering Command Contracting Manual
- Commercial Warranty
- Indefinite Quantity
- Procedures for Issuing Orders
- Consumption Tax Exemption Procedures on Purchase of Goods and Sevices by the United States
- Limitations on Authority of A-E
- Key Personnel
- Government Representatives
- Provisions
- Table of Contents Federal Acquisition Regulation (FAR)
- Contract Provisions
- Department of Defense Federal Acquisition Regulation Supplement (DFARS)
- Provisions Federal Acqusition Regulation (FAR)
- Taxpayer Identification
- Taxpayer Identification -Cont.
- Data Universal Numbering System (DUNS) Number
- Certification Regarding Department,Suspension, Proposed Debarment,and Other Responsibilty Matters
- Submission of Offers in the English Language
- Instructions to Offerors--Competitive Acquisition
- Instructions to Offerors--Competitive Acquisition -Cont.
- Instructions to Offerors--Competitive Acquisition
- Contract award
- FACSIMILE Proposals
- Facilities Capital Cost of Money
- Type of Control
- Evaluation of Options
- Definitions
- Small Business Concern Representation for the Small Business Competitiveness Demonstration Program
- Affirmative Action Compliance
- Certification of Toxic Chemical Release Reporting
- Statement of Limited Rights Data and Restricted Computer Software
- Cost Accounting Standards Notices and Certification
- Cost Accounting Standards -- Eligibility for Modified Contract Coverage
- Service of Protest
- Restriction on Severance Payments to Foreign Nationals
- Department of Defense Federal Acquisition Regulation Supplement (DFARS)
- Disclosure of Ownership or Control by a Foreign Government
- Compliance with Veterans Employment Reporting Requirements
- Identification and Assertion of Use,Release, or Disclosure Restrictions
- Identification and Assertion of Use,Release, or Disclosure Restrictions -Cont.
- Technical Data or Computer Software Previously Delivered to the Government
- Representation of Extent of Transportation by SEA
- CADD Delivariables
- CADD Delivariables -Cont.
- Performance Evaluation (Architect-Engineer)
- Performance Evaluation (Architect-Engineer) -Cont.
- Construction Criteria Base (CCB)
- Two New Prices for CCB
- System Requirements
- CCB Contents :4th Quarter 1996
- Tools Kit-Executable Programs on CCB
- Building a New CCB with Adobe
- SPECSINTACT Software on CCB
- SPECSINTACT Web Site
- The Newsletter for CCB Users
- Construction Criteria Base
- Construction Criteria Base
- NAVFACENGCOM Design Manuals and Military Handbooks for Engineering and Design
- NAVFACENGCOM Design Manuals and Military Handbooks for Engineering and Design -Cont.
- NAVFACENGCOM Design Manuals and Military Handbooks for Engineering and Design -Cont.
- Naval Facilities Engineering Command Engineering and Design Textbooks
- Design for Maintainabilty
- Foreword
- Design for Maintability
- Design for Maintability -Cont.
- Introduction
- Grounds and Site Improvements
- Grounds and Site Improvements -Cont.
- Refuse Collection
- Pavements & Utility Service Lines
- Building Exterior
- Metal Siding
- Pest Control
- Roofs
- Roofs-Cont.
- Doors and Windows
- Windows
- Floors,Stairs, and Entrances
- General Considerations
- Walls,Ceilings, and Accessories
- Ceilings
- Accessories
- Utility Systems
- Mechanical
- Equipment Rooms
- Heating, Ventilating, and Air Conditioning
- Heating, Ventilating, and Air Conditioning -Cont.
- Corrosion Control
- Corrosion Control -Cont.
- Corrosion Control -Cont.
- Corrosion Control -Cont.
- Water and WasteWater Systems
- Water/Wastewater Plants
- Sanitary Sewage System
- Sanitary Sewage System -Cont.
- Electrical
- Emergency Generators
- Power Plants (Prime and Standby)
- Power Plants (Prime and Standby) -Cont.
- Interior Design Presentation Format
- Distribution List for Interior Design Presentation Format
- Interior Design Presentation Format
- Table of Contents
- Introduction
- Overview of Military Interior Design
- SID/CID Requirements and Information
- Reviews and Revisions
- Information on Required Drawings and Documents
- Health,Safety,Accessibility and Environmental Quality
- Health,Safety,Accessibility and Environmental Quality -Cont.
- Specific Information for SID Submittals
- Specific Information for SID Submittals -Cont.
- Specific Information for CID Submittals
- Specific Information for CID Submittals -Cont.
- Specific Information for CID Submittals -Cont.
- General Design/Cost Information for CIDs
- General Design/Cost Information for CIDs -Cont.
- Cost Per Square Foot
- Cost Per Unit
- Glossary of Government Contract Terms
- Glossary of Government Contract Terms -Cont.
- Glossary of Government Contract Terms -Cont.
- Index of Referenced Standards
- Index of Referenced Standards -Cont.
- Furniture Illustration Sheet
- Order Data Sheet
- Furniture Placement Plan
- Color Guide Specifications
- Finish Schedule
- Interior Finishes
- CTF-Ceramic Tile
- Wall Coverings
- DOD Single Line Item Requisition System Document
- Results for Purchase
- Interior Design for Presentation Format
- Two New Prices for CCB
- CCB Basics
- CCB Contents:4th Quarter 1996
- Tools kit -Executable Programs on CCB
- Building a New CCB with Adobe
- SPECSINTACT Special
- What's New in SPECSINTACT Version 2.0
- The Newsletter for CCB Users
- Construction Criteria Base
- Construction Criteria Base (CCB) Third Quarter 1996
- NAVFACENGCOM Design Manuals and Military Handbooks for Engineering and Design
- NAVFACENGCOM Design Manuals and Military Handbooks for Engineering and Design -Cont.
- NAVFACENGCOM Design Manuals and Military Handbooks for Engineering and Design -Cont.
- Naval Facilities Engineering Command Engineering and Design Textbooks
- Design For Maintainability
- Foreword
- Design for Maintainabilty
- Design for Maintainabilty -Cont.
- Introduction
- Grounds and Site Improvements
- Grounds and Site Improvements -Cont.
- Refuse Collection
- Pavements and Utility Service Lines
- Building Exterior
- Metal Siding
- Pest Control
- Roofs
- General Considerations
- Doors and Windows
- Windows
- Floors,Stairs, and Entrances
- Floors,Stairs, and Entrances -Cont.
- Walls, Ceiling,and Accessories
- Accessories
- Accessories -Cont.
- Utility Systems
- Mechanical
- Equipment Rooms
- Valve and Equipment Pits
- Heating, Ventilating, and Air Conditioning
- POL Systems
- Corrosion Control
- Corrosion Control -Cont.
- Corrosion Control -Cont.
- Water and Waste Water Systems
- Water/Wastewater Plants
- Sanitary Sewage System
- Sanitary Sewage System -Cont.
- Electrical
- Lighting
- Power Plants (Prime and Standby)
- Power Plants (Prime and Standby) -Cont.
- Interior Design Presentation Format
- Distribution list for Interior Design Presentation Format
- Interior Design Presentation Format
- Table of Contents
- Introduction
- Overview of Military Interior Design
- SID/CID Requirements and Information
- Reviews and Revisions
- Information on Required Drawings and Documents
- Health,Safety, Accessibility,and Environmental Quality
- Health,Safety, Accessibility,and Environmental Quality -Cont.
- Specific Information for SID Submittals
- Specific Information for SID Submittals -Cont.
- Specific Information for CID Submittals
- Specific Information for CID Submittals -Cont.
- Specific Information for CID Submittals -Cont.
- General Design/Cost Information for CIDs
- General Design/Cost Information for CIDs -Cont.
- Cost Per Square Foot
- Cost per Unit
- Glossary of Government Contract Terms
- Glossary of Government Contract Terms -Cont.
- Glossary of Government Contract Terms -Cont.
- Index of Referenced Standards
- Index of Referenced Standards -Cont.
- Furniture Illustration Sheet
- Order Data Sheet
- Furniture Placement Plan
- Color Guide Specifications
- Exterior Finishes
- Interior Finishes
- Paint
- Wall Coverings
- DOD Single Line Item Requisition System Document
- Request for Purchase
- Interior Design Presentation Format
- Instructions for Obtaining Entry Passes to Military Reservations
- Navy Regional Hawaii
- Entry into the CIA is restricted to U.S. citizens and U.S. nationals only
- MIDWAY Island
- Telecommunication Centers
- Boat Entry
- Visit Request for Pearl Harbor Naval Shipyard
- Privacy Act Statement
- Appendix A-II Special Access Determination Employment Information Form
- Appendix A-II Special Access Determination Employment Information Form -Cont.
- List of Company Vehicles that Require A CIA Vehicle Pass
- Request for Escorted Visit for U.S. Citizen Visitors Only
- Privacy Act Statement
- Department of Defense Personnel Security Questionnaire
- Naval Facilities Engineering Command Contractor's Invoice
- Naval Facilities Engineering Command Contractor's Invoice -Cont.
- Instruction to Complete A-E Invoice
- Contract Performance Statement
- Amendment of Solicitation/Modification of Contract
- Instructions
- Instructions -Cont.
- Contractor's Release
- Close-Out of Contracts
- PACNAVFACENGCOM Design Review Checklist
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- PACNAVFACENGCOM Design Review Checklist -Cont.
- Site Plan and Civil Sheets
- Site Plan and Civil Sheets -Cont.
- Specifications
- Section 01500, Temporary Facilities and Controls
- Cost Engineering
- Fire Protection
- PACNAVFACENGCOM Redicheck Coordination Review Checklist
- Structural Plan
- Architectural Plan
- Mechanical and Plumbing Plan
- Mechanical and Plumbing Plan -Cont.
- Electrical Plan
- Specification Check
- PACDIV Review Comments
- Color Selection Samples
- Submittal Register Instructions
- QC Organization
- Government
- Submittal Register
- Submittal Register -Cont.
- Critical Items Summary
- Electrical
- Historical and Archaeological Resources
- Recommended Field Consultation
- Activity Security Officer/Security Engineer
- Non-Shipyard Activities
- A-E Letter Head
- Naval Shipyard Transmittals
- Industrial Hygiene Officer
- Points of Contact
- Transmittal/Review/Approval
- Submittal Flow Chart
- Energy Conservation Techniques
- Guidance for Preparation of Computer Energy Analysis
- Architectural Alternatives
- Lighting Alternatives
- Energy Efficient Electrical Products
- Energy Efficient Products
- Energy Efficient Products Application Criteria
- Save Money by Procuring Energy-Efficient Transformers
- Figure 4 Transformer Load Losses for Various Energy Costs
- Procurement Evaluation Method
- References
- NCEL Techdata Sheet
- Retrofit Example
- Conclusions
- NCEL Contacts
- Design Energy Target Reductions,Interim Technical Guidance
- Technical Guidance
- Distribution
- Chapter 8: Energy Conservation Criteria
- Energy Calculation Method
- Active Solar Analysis
- Final Design Procedure
- Geothermal Energy
- Table 8-1 Design Energy Targets (DET)
- Table 8-1 Design Energy Targets (DET) -Cont.
- Table 8-2 Fuel Conversional Factors
- Table 8-3. Weather Region Definitions
- Table 8-4. Building Envelope Component Guidelines
- Table 8-4. Building Envelope Component Guidelines -Cont.
- Table 8-5. Facility Type Categories
- Branch Policies
- Alarm and Detection Systems
- Underflood Detectors
- Layout of New Nonprogrammable or Nonaddressable Systems
- Submittals
- Sprinkler Systems
- Sprinkler Piping
- Supervision of Control Valves
- Cold Storage Warehouses
- Carbon Dioxide Systems
- CO2 Piping Pressure Test
- Sealing of the Area
- Dry and Wet Chemical Extinguishing Systems
- Fire Pumps
- Fire Pump Houses
- Foam Extinguishing Systems
- Miscellaneous
- Hazardous Material Storage
- Fire Protection Design Analysis
- Fire Protection Design Analysis Checklist
- Fire Protection Criteria
- Fire and Smoke Partitions, Fire Walls
- Extinguishing Systems
- Extinguishing Systems -Cont.
- Dry Chemical Systems
- Water Supply
- Fire Alarm and Detection Systems
- Fire Extinguisher Cabinets
- Standpipes
- Fire Protection in Elevator Hoistsways
- Distribution
- Fire Protection Criteria for Elevators
- Roofing Design Criteria
- New NAVFAC Roofing Design Criteria
- New NAVFAC Roofing Design Criteria -Cont.
- Attachment
- Scupper Through Roof Edge
- Scupper Through Roof Edge -Cont.
- Attachment (3)
- Attachment (4)
- Attachment (5)
- Attachment (6)
- Attachment (7)
- Vent Stack Detail
- Attachment (9)
- Attachment (10)
- Attachment (11)
- Attachment (12)
- Attachment (13)
- Attachment (14)
- Flashing Structural Member Through Roof Deck
- Attachment (16)
- Construction Quality Management (CQM) Program
- Construction Quality Management (CQM) Program -Cont.
- Boring Log
- Boring Log -Cont.
- Standard Drawing Sheet Size
- Figure 3. Title Block and Revision Block
- Figure 4. Vertical Title Block
- Figure 5 Sample Title Sheet -BID Items
- Figure 6. Sample BID Item No.2
- Figure 1. Graphic Scales-Architectural Type
- Figure 2. Graphic Scales-Engineering Type
- Figure 3. Metric Graphic Scales
- Outline Specification for Repairs to Damaged Culverts
- Table of Contents
- Table of Contents -Cont.
- Earthwork
- Cast-in-Place Concrete
- Structural Steel
- Roof Scuttle
- Stainless Steel Counters
- Metal Fabrications
- Fabrications Finishes
- Execution
- Example of Amendment Before Award
- Unaccompanied Enlisted Personel Housing Modernization
- Appendix U
- Document Table Of Contents
- Instructions to Proposers
- Availability for Examination of Specifications
- FACSIMILE Proposals
- Notice of Requirement for Affirmative Action to Ensure Equal Employment
- Notice of Buy American Act Requirement
- Service of Protest
- Preparation of Proposals --Construction
- Document Table of Contents
- Document Table of Contents -Cont.
- Document Table of Contents -Cont.
- Contract Clauses
- Commercial Warranty
- Individual Surety/Sureties
- Notice of Bonding Requirements
- Document Table of Contents
- Document Table of Contents -Cont.
- Requests for Equitable Adjustment
- Transportation of Supplies by Sea
- Transportation of Supplies by Sea -Cont.
- Notification of Transportation of Supplies by Sea
- Accident Prevention
- Record Drawings
- Government Representatives
- Appendix W Conversion Factors for the Most Common Units Used in Building Design
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Appendix W Conversion Factors for the Most Common Units Used in Building Design -Cont.
- Design Guidance for Electrical Power Systems Serving Nonlinear Harmonic Loads
- Action
- Design/Build IFB Specifications Project Package
- General Requirements
- RFP Format Specifications Project Package
- Table of Contents
- Table of Contents -Cont.
- Table of Contents -Cont.
- Acquisition Requirements
- Technical Requirements
- Design/Construction Criteria
- Contactor Quality Control
- General
- Minimum Controls
- Submission Requirements
- Proposal Standards
- Technical Evaluation Manual
- Technical Evaluation Manual
- Technical Evaluation Factors and Sub-Factors
- Technical Evaluation Techniques
- Environmental Protection
- Technical Requirements
- Construction Contractor's A-E Cover Sheet For Design/Build Projects
- IFB Specifications Navy Table of Contents
- General Requirements
- IFB Specifications Project Package
- Sample Project Package
- Sample A-E Cover Sheet
- General Requirements
- Summary Of Work
- Submittal Procedures
- Submittal Register
- Quality Control
- Test/Requirements List
- Contractor Production Report
- Contractor Quality Control Report
- Contractor Quality Control Report -Cont.
- Contractor Quality Control Report -Cont.
- Testing Plan and Log
- Rework Items List
- Blank Page
- Blank Page
- Blank Page
- Blank Page
A-E Guide for Architect -Engineer Firms Performing Services
|
|