Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


ADMIN BLDGS, FIRE PROTECTION IMPRVS (PH V), CAMP H.M. SMITH
40981347
be obtained--
(1)
by telephone at (215) 697-2667/2179; or
(2)
through the DODSSP Internet site at http://www.dodssp.daps.mil.
1.7
FAR 52.211-14, NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE USE (SEP
1990)
Any contract awarded as a result of this solicitation will be a __ DX rated
order; XX DO-C2 rated order certified for national defense use under the
Defense Priorities and Allocations System (DPAS) (15 CFR part 700), and the
Contractor will be required to follow all of the requirements of this
regulation.
1.8
FAR 52.215-5, FACSIMILE PROPOSALS (OCT 1997)
(a)  Definition.  "Facsimile proposal," as used in this provision, means a
proposal, revision or modification of a proposal, or withdrawal of a
proposal that is transmitted to and received by the Government via
facsimile machine.
(b)  Offerors may submit facsimile proposals as responses to this
solicitation.  Facsimile proposals are subject to the same rules as paper
proposals.
(c)  The telephone number of receiving facsimile equipment is:
(808)
474-7316.
(d)  If any portion of a facsimile proposal received by the Contracting
Officer is unreadable to the degree that conformance to the essential
requirements of the solicitation cannot be ascertained from the document--
(1) The Contracting Officer immediately shall notify the offeror and
permit the offeror to resubmit the proposal;
(2) The method and time for resubmission shall be prescribed by the
Contracting Officer after consultation with the offeror; and
(3) The resubmission shall be considered as if it were received at the
date and time of the original unreadable submission for the purpose of
determining timeliness, provided the offeror complies with the time and
format requirements for resubmission prescribed by the Contracting
Officer.
(e) The Government reserves the right to make award solely on the facsimile
proposal.  However, if requested to do so by the Contracting Officer, the
apparently successful offeror promptly shall submit the complete original
signed proposal.
1.9
FAR 52.222-23, NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)*
a.
The offerors attention is called to the Equal Opportunity clause and
DOCUMENT 00201
Page 3








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business