SECTION 5
RESPONSIBILITIES OF THE A/E
1. QUALITY OF WORK: The work of
omissions. The A/E shall prepare amendments
in
accordance
with
the A/E will be reviewed by SOUTH-
SOUTHNAVFACENGCOM
Guide
NAVFACENGCOM to the extent necessary
Specification 01007, entitled "CONTRACT
to assure compliance with life safety, public
AMENDMENTS-GUIDANCE AND PRO-
law, authorized scope limitations, customer
CEDURES." These services will be provided
requirements,  and  cost  limitations.
SOUTHNAVFACENGCOM
WILL
NOT
by the A/E without additional compensation.
UNDERTAKE A DETAILED TECHNICAL
2. SCOPE LIMITATIONS: The A/E shall
REVIEW OF THE A/E'S WORK. It will be
the responsibility of the A/E, acting in a
design the Project in accordance with the
professional capacity, to ensure accuracy,
Scope Limitations and Project Description in
completeness, and correctness of the design,
the Statement of Work. The scope of any
cost estimate and all engineering concepts and
feature may not be exceeded without written
details of the work, including the coordination
approval of the PM. Minor deviations in the
of the various architectural, civil, structural,
scope of supporting items may be made to suit
mechanical, electrical, and other subdivisions
field conditions.
thereof with each other and with the
specifications.  THE A/E ASSUMES FULL
3. CHANGES IN SCOPE: The A/E shall
RESPONSIBILITY FOR THE TECHNICAL
not deviate from the authorized Scope. IN
ACCURACY
AND
PROFESSIONAL
NO CASE SHALL CHANGES IN SCOPE BE
ADEQUACY of all work which he presents
MADE AT THE ACTIVITY LEVEL.  THE
over his signature. THE A/E SHALL ASSIGN
A/E'S RESPONSIBILITY IS DIRECTLY TO
COMPETENT
ARCHITECTS
AND
THE CONTRACTING OFFICER AND ANY
ENGINEERS, EXPERIENCED IN THEIR
REQUESTED  DEVIATION  FROM  THE
RESPECTIVE  DISCIPLINES,  TO  THE
SCOPE OR ELABORATIONS WITHIN THE
VARIOUS PARTS OF THE WORK TO
SCOPE MUST BE BROUGHT TO THE
INSURE ALL ELEMENTS ARE DESIGNED
ATTENTION  OF  THE  CONTRACTING
CORRECTLY AND IN ACCORDANCE WITH
OFFICER FOR RESOLUTION. During the
THE
BEST
ARCHITECTURAL
AND
progress of the work, the A/E may expect
ENGINEERING PRACTICES.
ERRORS
minor changes in criteria within the general
AND/OR DEFI-CIENCIES IN THE A/E'S
scope of the project and should make
WORK  SHALL  BE  CORRECTED  OR
necessary adjustments accordingly.  Should
REVISED BY THE A/E AT NO ADDITIONAL
MAJOR changes in the Scope be authorized,
FEE.  During the bidding and construction
appropriate modification to the A/E contract
phases, The A/E shall prepare amendments to
will be negotiated in accordance with the
the construction documents and cost estimates
"Changes - Fixed Price" clause of the Contract
as necessary to interpret and clarify the
Clauses.
documents  and  to  correct  errors  and
RESPONSIBILITIES OF THE A/E
5-1