1. DESIGN GUIDANCE:
. A/E shall obtain the Guides at his expense, as
stated  in  paragraph  titled  "OBTAINING
1.1  GENERAL: Project specifications shall
DESIGN CRITERIA" in Section 8. Note that
some of the guides listed also include a
be non-proprietary, with no "Gold Plating",
SOUTHNAVFACENGCOM Interim Regional
adhering to the requirements of MIL-HDBK-
Revision.  The A/E shall incorporate these
1006/1 "Policy and Procedures for Project
Interim  Regional  Revisions  (provided  by
Drawing  and  Specification  Preparation",
SOUTHNAVFACENGCOM)
in
the
SODIV-TG-1006 "Technical Guidance for
specifications, where applicable.
Specifications  Preparation",  and  to  the
requirements specified herein.
The Guide
1.3  FEDERAL
AND
MILITARY
Specifications
listed
in
the
current
SPECIFICATIONS:  Federal and Military
SOUTHNAVFACENGCOM Index of Criteria
SHALL BE UTILIZED; however, if certain
specifications and standards are NOT stocked
portions of the work in the project are not
for issue by SOUTHNAVFACENGCOM. The
included in any of the Guides listed, the A/E shall
A/E  is  responsible  for  procuring  these
prepare the necessary sections, using the same
documents as necessary. See Section 8 for
type format as that in the Guides.
ordering information.
1.2  GUIDE SPECIFICATIONS: Over the
2. SPECIFICATIONS PREPARATION: The
years the repetitive projects constructed by the
project specifications shall be prepared utilizing
Navy have resulted in the establishment of many
the  "SPECSINTACT"  system  of  the
standard methods of construction, materials and
"CONSTRUCTION
CRITERIA
BASE"
procedures.  In addition, legal and regulatory
(CCB).  See SODIV-TG-1006 for additional
requirements have caused standardization.
requirements on specifications preparation.
NAVFAC and SOUTHNAVFACENGCOM
have developed guide specifications to cover a
3. SUBMITTAL REQUIREMENTS:
considerable number of these situations. The
A/E shall use these guides where they are
3.1
GENERAL (ALL SUBMITTALS):
applicable, however, he is CAUTIONED TO
EDIT AND MODIFY THEM TO SUIT THE
a. All submittals shall be on 8-1/2 X 11 inch
PROJECT REQUIREMENTS.
paper.
b.No
"Cut-and-Paste"
specifications
1.2.1  Which Guides to Use: The A/E shall
permitted.
utilize the Guides listed in the current
SOUTHNAVFACENGCOM Index of Criteria,
which is updated approximately every three
months.  This document is located on the
SOUTHNAVFACENGCOM criteria web page
at
http://www.efdsouth.navfac.
navy.mil/facilities_acquisition/criteria/index.htm
DELIVERABLES
11-34








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business