50% completion. Interior demolition should
b.Describe
the
Primary
Service
be shown on separate plan.
Transformation to Secondary Service:
b.Site Plan: This plan should be developed to
1) Primary and secondary voltage rating.
2) Describe  the  transformer  or  unit
approximately 50% completion. Information
on existing conditions should be complete and
substation
giving
electrical
field checked.
characteristics.
3) Describe the proposed primary and
c. Lighting Plan(s):  These plans should
secondary switchgear.
4) Describe the proposed primary and
show a building's full floor plan (first, second,
etc.) with the layout and type of fixtures to be
secondary protection devices.
used and the design footcandle levels for all
c. Describe  the  Electrical  Systems
types of lighting systems.
including the following:
d.Power Plan(s): These plans should show a
1) Lighting systems
2) Power systems
building's full floor plan (first, second, etc.)
3) Emergency lighting
with the location of receptacles, panelboards,
4) Emergency power
switchboards,
motor
control
centers,
5) Grounding system or systems
transformers and any other major equipment
6) Telephone system
throughout the inside and outside of the
7) Other systems such as television,
building or project.
paging, call, etc.
e. Single Line Diagram:  This drawing
8) Physical and electronic security features
should be developed to approximately 50%
such as IDS, lighting access control,
completion showing all panels, switchboards,
tempest, etc.
motor control centers, transformers and other
d.A  statement  describing  proposed
major electrical loads such as M.G. sets, A/C
pertinent standards of design, such as
chillers, etc.
voltage regulation, lighting intensities, and type
f.  Additional Plans/Risers (Show Location
of lighting fixtures.
of Devices):
1) Telephone
2.2  35% DESIGN SUBMITTAL:  The
2) IDS
35% Design Submission shall include the
3) Others as required
following:
2.2.2
35% Design Data:
a. Preliminary Drawings.
b. Design Data (Basis of Design, Design
2.2.2.1  35% Electrical Basis of Design:
Calculations and Economic Analysis, if
See paragraph 2.1.2.1 for requirements.
required).
2.2.2.2  35% Design Calculations: Refer to
2.2.1
35% Drawings:
SODIV-TG-1004 for required calculations.
a. Existing Site and Demolition Plan: This
plan should be developed to approximately
ELECTRICAL SUBMITTAL REQUIREMENTS
17-2