Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Custom Search
 
  
 


REVCOM FORMAT FOR NON SUCCESS USERS
DESIGN COORDINATION AND REVIEW - COMMENTS
PROJECT LEADER
SOUTHWESTNAVFACENGCOM 11012/1A (8-93)
John Smith
COMMENTS BY:
CODE:
PHONE:
DATE:
Jane Doe
4CN.JD
10 January, 2000
619-532-XXXX
Cost Engineer
PROJECT TITLE AND LOCATION:
TYPE OF REVIEW:
Q-202, SOF Waterfront Operations facility, Naval Amphibious
100% Dust Off
Base, Coronado, California ( Dust Off 100% Submittal )
Submittal
NO.
DWG.NO.
COMMENTS
A-E RESPONSE
or
SPEC.SECT.
001
GENERAL
All Government Estimates are now to be completed using
the new NAVFAC approved estimating format in the
program called "Success". This is a software program
developed for commercial use by the Navy. The latest
version is of the program is "SUCCESS 4.0". Estimators,
or firms that are doing current cost estimating work for the
Navy, are required to use the new program as of 01
October 1998., a small project is an ideal project to start
with. This requirement is a new mandatory process,
since in the very near future the government is now
in the process of capturing all bidding documents by
the electronic media. As of the above date, we will no
longer accept estimates in other formats, unless it is
cleared with the Cost Engineering representative for
each Activity Focus Team, or by contacting the
Senior Cost Engineer, Code 04CN.JB, Southwest
Division at (619)532-3713.
002
This estimate was not done in accordance with the
"Success" software program as required by the Southwest
Division AE Guide.
003
The format is also incorrect. See attached word document
and duplicate.
004
The sequencing of the estimate sheets, describing base bid
and options, is very confusing. Please contact the above
reviewer as soon as possible to discuss.
14
EXHIBIT 2








Western Governors University
 


Privacy Statement - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business