Custom Search
Back
Up
Guide for Architectural - Engineering Firms
Guide for Architectural - Engineering Firms
Foreword
Record of Revisions
Table Of Contents
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Table Of Contents -Cont.
Chapter 1. General Requirements
Definitions
Definitions -Cont.
Naval Facilities Engineering Command Design Awards Program
Other Awards Programs Related to NAVFAC's Facilities Business
Interim A-E Evaluation
Chapter 2. General Performance Requirements
Quality Assurance
Review Comments Resolution
Project Documentation
Available Site Information Verification
Communications During Construction
REVCOM Format For Non Success Users
Chapter 3. Engineering Services
Natural Resources
Survey Monuments
Geotechnical Investigation
Boring Logs
Geotechnical Review Certification
Architectural Review Board (ARB)
Architectural Review Board (ARB) -Cont.
Value Engineering Policy and Guidance
Indefinite Quantity Contracts
Scope of Work for Value Engineering Services
Color Freehand Renderings
Comprehensive Interior Services for Furniture and Furnishings Procurement
Comprehensive Interior Services for Medical and Dental Facilities
Occupational Safety and Health Report
Planning and Design for Safety
Facility Changes
Site Investigation of Suspect Materials
Sample Analysis
Permit Application Submittal
Consolidated Compliance Assessment Report
Destructive Testing
Designer to ROICC Presentation
Travel
Soil Boring Log Key Soil Data Log
Typical Soil Boring Log Soil Data Log
Sample Soil Boring Legend
Survey Monument
Brass Cap
Chapter 4. Construction Contract Support Services
Responsibility
OMSI Types
Computer Graphics Data-Base
Field Consultation Report
Chapter 5. Submittals
Percent Design
Transmittals
Metric Measurements
Resubmittal
Sample A-E Letter Head
Sample A-E Letter Head
CD ROM Disk Label Format
Chapter 6. Basis of Design Report
Base Exterior Architecture Plan (BEAP)
Weight Handling Equipment
Doors, Windows And Wall Penetrations
Storm Sewer System And Surface Drainage
Water Systems
Sanitary Sewer Systems
Airfield Pavement Systems
Plant Materials
Sustainable Development
Equipment Rooms
Non Seismic Design Requirements
Ground Motion
Steel Design
Wood Design
Seismic Rehabilitation Design Requirements
Ground Motion
Concrete Design
Seismically Isolated Structure Design
Quality Assurance
Basis of Design
Pre-engineered Metal Building Systems
Structural Notes
Structural Steel Paint Recoating
Miscellaneous Requirements
Minimum Design Requirements
Concrete Masonry Construction
Cold Formed Metal framing
Heating, Ventilating And Air Conditioning (HVAC)
Ventilation
Cold Storage
Fuel Distribution And Storage
Facilities
Electrical Distribution System
Instrumentation And Control Systems
Cathodic Protection
Chapter 7. Drawings
Storm Water Discharge Requirements
NAVFAC Drawing Numbers
Section/Detail Identification
Approval Of Drawings
Civil Drawings
Demolition Plan
Grading Plan
Geotechnical Drawings
Planting Plan
Architectural Site Plan
Large Scale Plans
General Notes And Typical Details
Mechanical Drawings
Single Line Diagrams
Fire Protection System(s)
Existing Topography
Utility Plan
Paving Plan
Profiles
Dredging Drawings
Details And Sections, Civil
Painting And Striping
Irrigation Plan
Planting, Site Furniture, And Drainage Details
Architectural Site Plan
Door And Window Schedules
Equipment Layouts
Foundation Plan
Elevations
Sections And Details
Precast Concrete Wall Panels
Roof Investigations
Large Scale Site Plans
Large Scale Mechanical Plans
Sequence Of Operation
Demolition Plan
Large Scale Plumbing Plans
Electrical Drawings
Site Plan
Floor Plans
Schedules And Tables
Cathodic Protection
Fire Pumping Systems
Fire Alarm Systems
New Fire Hydrant
Graphic Scale
Chapter 8. Project Specification
Proprietary Products
Extended Warranty Clauses
Product Identification
Project Information Form
Magnetic Media
Percent Submittals
Performance Specifications
Proprietary Specifications
Restrictive Specifications
General Project Information
Instructions to Bidders/Proposers
Instructions to Bidders/Proposers -Cont.
Instructions to Bidders/Proposers -Cont.
Instructions to Bidders/Proposers -Cont.
Information For Section 00102
Information for Section 00710 or 00720
Information Required by Section 00830
Software and Computer Requirements
Proprietary Products
Preparation of Amendments
Sample Format
Refrigerant Piping
Drawing Changes
List of Drawings
Contract Drawings
Preparation of Change Order Request (COR'S)
Change Order Request Content
Procedures for Combining Separate Projects
Procedures for Combining Separate Projects -Cont.
Project Table Of Contents
Outline Specifications
Technical Sections
Preparation of Amendments
Chapter 9.Cost Estimates
Success
Detailed Estimating Criteria
Unit Costs
General Requirements
Estimate Design Development Contingency
Percent Estimates
Change Order Request Estimates
Operation and Maintenance (O&M) Projects
Chapter 10. A-E Invoicing Procedures
Period Ending Date
Estimated Cost
Total Value Of Contract Through Modification
Disallowance on Invoiced Amount
Airfield Pavement and Road Repair NAVSIA San Diego
Airfield Pavement and Road Repair NAVSIA San Diego -Cont.
Airfield Pavement and Road Repair NAVSIA San Diego -Cont.
Naval Facilities Engineering Command
A-E Travel Claim Voucher
Contractor's Release Under Contract
Calculation Requirements
Fire Protection
Irrigation System
Electrical
Electronic Design Data Requirements
Deliverables
Required Files
Required Documentation
Composition of Files
Project Schedule
Attachment C
Types of Construction -Fire Resistive Requirements
Travel Distance to Exits
Roof Access for Manual Fire Fighting
Manual Fire Alarm and Detection Systems
Attachment D Project Review Environmental Permit Checklist
Attachment D Project Review Environmental Permit Checklist -Cont.
Attachment D Project Review Environmental Permit Checklist -Cont.
Attachment D Project Review Environmental Permit Checklist -Cont.
Attachment D Project Review Environmental Permit Checklist -Cont.
Attachment D Project Review Environmental Permit Checklist -Cont.
Equipment Requiring Permits
Operation and Maintenance Support Information (OMSI)
Generic Contents
Generic Contents -Contents
Division 2
Division 2 -Cont.
Submittal Requirements
Submittal Requirements -Cont.
Operation and Maintenance Manual
Section B- Preventive Maintenance
Section C- Corrective Maintenance
Section D-Appendix
Submittal Requirements
Final Submittal
Microfilm Copy
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Blank Page
Guide for Architectural - Engineering Firms
Privacy Statement
-
Copyright Information.
-
Contact Us